United Arab Emirates

Aweer “H” – Ph l — 607 MW Natural Gas

Natural Gas Verified

Aweer “H” – Ph l is a 607 MW gas power plant located in United Arab Emirates. View location, capacity, and technical details.

Capacity
607 MW

Installed

Commissioned
1998

Year online

Owner
DEWA

Operator

Location
25.15, 55.43

Coordinates

Insights

#43
largest in United Arab Emirates
#1,406
largest Natural Gas worldwide
#3,966
largest worldwide
1998
1 yrs older than avg
12
operated by DEWA
50
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
607 MW
Commissioned
1998
Status
Operational
Owner
DEWA
Country
United Arab Emirates
Coordinates
25.149, 55.427

Estimated Carbon Footprint

Annual CO₂
1,172,469 t

tonnes / year

Lifetime CO₂
35,174,072 t

over ~30 yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

254,885
cars / year
156,329
homes / year
53,294,048
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Aweer ‘H’ Power Plant, located in the United Arab Emirates, is a significant facility in the nation’s energy sector, with a generation capacity of 607 megawatts (MW). Owned and operated by the Dubai Electricity and Water Authority (DEWA), this gas-fired power plant was commissioned in 1998 and has played a crucial role in supporting the growing energy demands of Dubai and the surrounding regions. As one of the essential components of the UAE’s energy infrastructure, Aweer ‘H’ contributes to the stability and reliability of electricity supply in a rapidly developing urban environment.

The Aweer ‘H’ Power Plant utilizes natural gas as its primary fuel source, which is a cleaner alternative compared to other fossil fuels such as coal or oil. Natural gas combustion produces fewer greenhouse gas emissions and particulates, making it a preferred option for many modern power plants. The technical details of the plant involve advanced gas turbine technology, which enhances efficiency and reduces operational costs. As the UAE aims to diversify its energy mix, the reliance on natural gas in plants like Aweer ‘H’ aligns with national policies focused on sustainability and environmental stewardship.

In terms of environmental impact, the use of natural gas significantly lowers the carbon footprint associated with electricity generation. Although the Aweer ‘H’ Power Plant still emits carbon dioxide and other emissions typical of fossil fuel combustion, its emissions are considerably less than those produced by older, less efficient coal-fired plants. DEWA’s commitment to reducing the environmental impact of its operations is evident in its continuous pursuit of innovations and technologies that enhance the efficiency of gas-fired plants while minimizing emissions.

Regionally, the Aweer ‘H’ Power Plant holds strategic significance as it not only supports the electricity needs of Dubai but also contributes to the overall energy security of the United Arab Emirates. As the UAE continues to grow economically and demographically, the demand for reliable and efficient energy solutions becomes increasingly critical. The Aweer ‘H’ facility exemplifies the country’s efforts to modernize its energy infrastructure while balancing economic growth with environmental responsibility. Furthermore, the power plant serves as a model for future energy projects, showcasing the potential of natural gas in achieving energy efficiency and sustainability goals in the region.

Overall, the Aweer ‘H’ Power Plant stands as a key asset in the UAE’s energy landscape, facilitating the transition towards a more sustainable energy future while meeting the immediate power demands of a vibrant metropolitan area. Its strategic use of natural gas underscores the country’s commitment to cleaner energy solutions, making it a vital component of the UAE’s long-term energy strategy.

More Natural Gas plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.