Australia

Bell Bay (Bell Bay Three) — 115 MW Natural Gas

Natural Gas Verified

Bell Bay (Bell Bay Three) is a 115 MW gas power plant located in Australia. View location, capacity, and technical details.

Capacity
115 MW

Installed

Commissioned
2009

Year online

Owner
Aurora Energy Tamar Valley Pty Ltd

Operator

Location
-41.14, 146.90

Coordinates

Insights

#193
largest in Australia
#3,159
largest Natural Gas worldwide
#9,472
largest worldwide
2009
10 yrs newer than avg
1
operated by Aurora Energy Tamar…
20
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
115 MW
Commissioned
2009
Status
Operational
Owner
Aurora Energy Tamar Valley Pty Ltd
Country
Australia
Coordinates
-41.143, 146.903

Carbon Footprint

Annual CO₂
222,132 t

tonnes / year

Lifetime CO₂
6,663,951 t

over ~30 yrs

Intensity
490 g

Est. gCO2/kWh

Annual emissions equivalent to

48,290
cars per year
29,618
homes per year
10,096,895
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Plants

About this plant

Bell Bay (Bell Bay Three) is a 115 MW gas-fired power plant located in Tasmania, Australia, operated by Aurora Energy Tamar Valley Pty Ltd. The plant generates electricity using natural gas and was commissioned in an unspecified year.

It is the 75th largest gas plant in Australia. With 115 MW, it represents 0.41% of Australia’s total gas capacity of 28,163 MW. Australia has 175 gas plants with a combined capacity of 28,163 MW. Compared to the country’s largest gas plant, Tomago Aluminium Smelter at 810 MW, this facility is approximately 14% the size.

Gas plays a significant role in Australia’s energy mix, contributing to about 22% of the total electricity generation. The Bell Bay plant supports Tasmania’s energy needs, particularly during peak demand periods. It is situated approximately 200 km northwest of Hobart in the northern region of Tasmania.

More Natural Gas plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.