Bersimis-1 is a 1,178 MW hydro power plant located in Canada. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 1,178 MW
- Commissioned
- 1965
- Status
- Operational
- Owner
- Hydro-Québec
- Country
- Canada
- Coordinates
- 49.295, -69.551
Carbon Footprint
tonnes / year
over ~80 yrs
Est. gCO2/kWh
Annual emissions equivalent to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Plants
Manic-5
Canada · Hydroelectric
Centrale Manic-5
Canada · Hydroelectric
René-Lévesque (Manic-3)
Canada · Hydroelectric
Jean-Lesage (Manic-2)
Canada · Hydroelectric
Manic-5-PA
Canada · Hydroelectric
Outardes-3
Canada · Hydroelectric
About this plant
Bersimis-1 is a significant hydroelectric power plant located in Canada, with a total installed capacity of 1,178 megawatts (MW). Owned and operated by Hydro-Québec, it plays a vital role in the country’s energy sector, contributing to the diverse energy mix that characterizes Canada’s approach to electricity generation. The plant utilizes hydroelectric power, a renewable energy source that harnesses the kinetic energy of flowing water to generate electricity, making it an environmentally friendly alternative to fossil fuels.
Hydroelectric power plants like Bersimis-1 operate by channeling water from rivers or reservoirs through turbines. As the water flows, it spins the turbines, which in turn activate generators to produce electricity. The Bersimis-1 facility is strategically located on the Bersimis River, utilizing the river’s flow to maximize energy production. This facility is part of the larger Bersimis hydroelectric complex, which includes other plants that collectively enhance the region’s electricity generation capacity.
In terms of environmental impact, hydroelectric power generation is generally considered to be more sustainable than fossil fuel-based energy sources. It produces no direct emissions of greenhouse gases and has a lower carbon footprint. However, large-scale hydroelectric projects can have ecological consequences, such as the alteration of water ecosystems and impacts on local wildlife habitats. The Bersimis-1 plant has undergone various environmental assessments to mitigate any negative effects on the surrounding ecosystem, ensuring that it operates within regulatory guidelines aimed at protecting biodiversity.
Regionally, Bersimis-1 is crucial for the electrical grid in Quebec and contributes significantly to Hydro-Québec’s role as a leading utility provider. The province is known for its abundant freshwater resources, which are ideal for hydroelectric power generation. The energy produced by Bersimis-1 not only meets local demand but also supports interprovincial electricity sales, contributing to the economic stability and energy security of the region. Additionally, the plant serves as a source of employment and economic activity in the area, providing jobs during both the construction and operational phases.
In conclusion, Bersimis-1 stands as a key player in Canada’s renewable energy landscape, exemplifying the country’s commitment to harnessing natural resources sustainably. Its significant capacity and operational efficiency underscore the importance of hydroelectric power in meeting energy needs while striving for environmental responsibility.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.