Türkiye

Bolu Göynük power station — 270 MW Coal

Coal Verified

Bolu Göynük power station is a 270 MW coal power plant located in Turkey. View location, capacity, and technical details.

Capacity
270 MW

Installed

Commissioned
2015

Year online

Owner
Aksa Enerji

Operator

Location
40.25, 30.81

Coordinates

Insights

#92
largest in %s
#1,932
largest %s worldwide
#6,419
largest worldwide
2015
%d yrs newer than avg
3
operated by %s
12
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
270 MW
Commissioned
2015
Status
Operational
Owner
Aksa Enerji
Country
Türkiye
Coordinates
40.251, 30.813
Wikipedia
Link

Estimated Carbon Footprint

Annual CO₂
1.1M t

tonnes / year

Lifetime CO₂
42.7M t

over ~%d yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

231,892
cars / year
142,227
homes / year
48.5M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Bolu Göynük power station stands out in Turkey’s energy landscape as the 92nd largest among 368 power generation facilities, contributing a notable 0.29% to the nation’s total capacity of 94,534 MW. With a generation capacity of 270 MW, this coal-fired power plant is ranked 34th out of 42 coal facilities in Turkey, underscoring its role in a primarily gas-dominated energy profile. Commissioned in 2015 by Aksa Enerji, the plant utilizes advanced coal technology, ensuring efficient energy generation while adhering to environmental standards.

Geographically, Bolu Göynük is strategically positioned near several significant hydroelectric plants, including the Gökçekaya Dam, which boasts a capacity of 278.4 MW, and the Yenice Dam at 37.89 MW. This proximity to hydroelectric generation underscores the diverse energy mix in the region, with the hydro plants complementing the coal output of Bolu Göynük. The combination of these facilities highlights a balanced approach to energy generation, mitigating some of the environmental impacts associated with coal use.

On a national scale, Turkey’s energy infrastructure is heavily reliant on natural gas, which accounts for a substantial portion of the total capacity. The Bolu Göynük power station, while modest in size, plays a critical role in supporting the grid, particularly during peak demand periods when gas supply may be constrained. As Turkey continues to transition towards renewable energy solutions, the presence of coal facilities like Bolu Göynük remains pivotal in ensuring energy security and stability.

Aksa Enerji, the operator of Bolu Göynük, is committed to modernizing Turkey’s energy landscape and enhancing its operational efficiency. The plant’s commissioning in 2015 aligns with Turkey’s broader energy strategy aimed at diversifying its energy sources and increasing domestic production capabilities.

Looking ahead, the Bolu Göynük power station will likely continue to be an essential player in Turkey’s energy mix, navigating the challenges of environmental regulations while contributing to the nation’s energy security. As Turkey seeks to balance economic growth with sustainable energy practices, the role of coal plants like Bolu Göynük will be carefully evaluated against the backdrop of a rapidly changing energy landscape.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.