SVN

Brestanica (TEB) — 297 MW Natural Gas

Natural Gas Verified

Brestanica (TEB) is a 297 MW gas power plant located in Slovenia. View location, capacity, and technical details.

Capacity
297 MW

Installed

Commissioned
1975

Year online

Owner
TEB

Operator

Location
46.00, 15.48

Coordinates

Insights

#3
largest in %s
#2,286
largest %s worldwide
#6,207
largest worldwide
1975
%d yrs older than avg
1
operated by %s
21
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
297 MW
Commissioned
1975
Status
Operational
Owner
TEB
Country
SVN
Coordinates
45.998, 15.480

Estimated Carbon Footprint

Annual CO₂
573,679 t

tonnes / year

Lifetime CO₂
17.2M t

over ~%d yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

124,713
cars / year
76,491
homes / year
26.1M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Brestanica power plant, located in Slovenia, plays a crucial role in the country’s energy generation landscape, harnessing gas as its primary fuel source. With a capacity of 297 MW, this facility significantly contributes to the national energy mix, providing reliable and efficient power to meet the demands of local consumers. Situated at coordinates 45.9975 latitude and 15.4796 longitude, Brestanica is strategically positioned to support the regional grid and enhance energy security within Slovenia. The use of gas-fired technology allows for flexible and responsive energy generation, making Brestanica an essential component of Slovenia’s efforts to transition toward a cleaner energy future. As a modern gas power plant, it employs advanced combustion techniques that optimize efficiency and minimize emissions, aligning with the European Union’s stringent energy policies aimed at reducing carbon footprints. The operational context of Brestanica is further reinforced by Slovenia’s commitment to diversifying its energy sources and decreasing dependency on fossil fuels. This power generation facility not only aids in balancing supply and demand but also plays an instrumental role in stabilizing the grid during peak periods. The importance of Brestanica extends beyond its capacity, as it serves as a key player in Slovenia’s broader strategy to ensure energy reliability and sustainability.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.