Canada

Bridge River 1 — 180 MW Hydroelectric

Hydroelectric Renewable Verified

Bridge River 1 is a 180 MW hydro power plant located in Canada. View location, capacity, and technical details.

Capacity
180 MW

Installed

Commissioned
1961

Year online

Owner
BC Hydro

Operator

Location
50.73, -122.24

Coordinates

Insights

#186
largest in Canada
#1,562
largest Hydroelectric worldwide
#7,773
largest worldwide
1961
23 yrs older than avg
50
operated by BC Hydro
13
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
180 MW
Commissioned
1961
Status
Operational
Owner
BC Hydro
Country
Canada
Coordinates
50.730, -122.240

Carbon Footprint

Annual CO₂
15,137 t

tonnes / year

Lifetime CO₂
1,210,982 t

over ~80 yrs

Intensity
24 g

Est. gCO2/kWh

Annual emissions equivalent to

3,291
cars per year
2,018
homes per year
688,058
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Plants

About this plant

Bridge River 1 stands as a vital component in Canada’s hydroelectric power landscape, ranking as the 186th largest power generation facility among 1334 plants nationwide. With a capacity of 180 MW, it contributes approximately 0.09% to Canada’s total capacity of 193,190 MW. While this percentage might seem small, the significance of hydroelectric power in the country cannot be overstated, with hydro facilities dominating the energy profile.

Operated by BC Hydro, Bridge River 1 employs advanced hydroelectric generation technology that converts the kinetic energy of flowing water into electricity. This method not only provides a renewable energy source but also minimizes greenhouse gas emissions, aligning with Canada’s commitment to reducing its carbon footprint. The plant’s commissioning dates back to its establishment, and it remains a crucial asset for the provincial grid.

Located in a region rich with hydro resources, Bridge River 1 is part of a network of nearby plants that further enhance its operational significance. The Bridge River 2, with a capacity of 298 MW, is just around the corner, while smaller facilities such as Seton (48 MW) and Walden North (16 MW) complement the hydroelectric generation capabilities. This clustering of hydroelectric plants not only ensures a steady supply of renewable energy but also enhances grid reliability in the face of fluctuating demands.

Canada’s energy profile is heavily dominated by hydroelectric power, which accounts for a significant majority of its total generation capacity. With a landscape that favors water resources, the country has positioned itself as a leader in renewable energy production. Bridge River 1, while small in terms of national capacity, plays a critical role in supporting local communities and industries, making it an essential part of the energy mix.

Looking ahead, the future of Bridge River 1 appears promising as Canada continues to prioritize renewable energy solutions. Its role in the transition towards a greener energy economy underscores the importance of hydroelectric power in achieving national sustainability goals. As technology advances and the demand for clean energy rises, facilities like Bridge River 1 will continue to be instrumental in shaping Canada’s energy landscape.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.