Canada

Brilliant Generating Station — 145 MW Hydroelectric

Hydroelectric Renewable Verified

Brilliant Generating Station is a 145 MW hydro power plant located in Canada. View location, capacity, and technical details.

Capacity
145 MW

Installed

Commissioned
1944

Year online

Owner
FortisBC

Operator

Location
49.32, -117.62

Coordinates

Insights

#224
largest in Canada
#1,819
largest Hydroelectric worldwide
#8,599
largest worldwide
1944
40 yrs older than avg
3
operated by FortisBC
20
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
145 MW
Commissioned
1944
Status
Operational
Owner
FortisBC
Country
Canada
Coordinates
49.325, -117.621
Wikipedia
Link

Estimated Carbon Footprint

Annual CO₂
12,194 t

tonnes / year

Lifetime CO₂
975,514 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

2,651
cars / year
1,626
homes / year
554,269
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The Brilliant Generating Station stands as a notable entity in Canada’s hydroelectric landscape, ranking #224 among 1,334 power generation facilities across the nation. This facility, located in British Columbia, contributes a capacity of 145 MW, which translates to approximately 0.08% of Canada’s total power generation capacity of 193,190 MW. As the 120th largest hydro plant in Canada, Brilliant plays a crucial role in a region characterized by its abundant water resources and commitment to renewable energy.

Commissioned in 1944 and operated by FortisBC, this hydroelectric facility employs the gravitational force of water to generate electricity, a technology that remains one of the most efficient and environmentally friendly methods of power generation. The plant harnesses the flow of water from the nearby rivers, converting potential energy into electrical energy through turbines, thus contributing to both local and national energy grids.

Brilliant Generating Station is part of a significant cluster of hydroelectric plants in its vicinity, including Boundary, which boasts a substantial capacity of 1,118.6 MW, Seven Mile at 805 MW, and Kootenay Canal with 570 MW. This regional concentration of hydro facilities underscores British Columbia’s reliance on hydroelectric power, which is a dominant fuel source across Canada. The presence of these nearby plants enhances grid reliability and allows for an efficient distribution of power, facilitating energy independence and sustainability within the province.

Canada’s energy profile is heavily skewed towards hydroelectric power, with hydro plants making up a vast majority of the 1,334 plants nationwide. The Brilliant Generating Station’s contribution, though modest in percentage terms, is significant within the local context, especially considering the province’s focus on renewable energy sources. This strategic positioning within the energy sector reflects the country’s ongoing commitment to reducing carbon emissions and promoting sustainable practices.

As FortisBC continues to operate and maintain the facility, the significance of Brilliant Generating Station extends beyond mere numbers. Its long-standing history since the mid-20th century illustrates the reliability and longevity of hydroelectric power as a foundational energy source. Looking ahead, the plant not only contributes to local energy needs but also aligns with broader national goals regarding climate change and renewable energy transitions, reinforcing the importance of such facilities in achieving a sustainable future.