BRN

Bukit Panggal CCGT Power Station Brunei — 110 MW Natural Gas

Natural Gas Verified

Bukit Panggal CCGT Power Station Brunei is a 110 MW gas power plant located in Brunei Darussalam. View location, capacity, and technical details.

Capacity
110 MW

Installed

Commissioned

Year online

Owner
Brunei National Petroleum Company

Operator

Location
4.83, 114.75

Coordinates

Insights

#3
largest in %s
#3,183
largest %s worldwide
#9,608
largest worldwide
2
operated by %s
11
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
110 MW
Commissioned
Status
Operational
Owner
Brunei National Petroleum Company
Country
BRN
Coordinates
4.828, 114.746

Estimated Carbon Footprint

Annual CO₂
212,474 t

tonnes / year

Lifetime CO₂
6.4M t

over ~%d yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

46,190
cars / year
28,330
homes / year
9.7M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

Bukit Panggal CCGT Power Station Brunei is a 110 MW gas-fired power plant located in Brunei Darussalam. It is operated by an undisclosed entity and is one of four gas plants in the country.

This plant ranks as the 3rd largest gas facility in Brunei, which has a total gas generation capacity of 586 MW from four plants. Bukit Panggal represents approximately 18.77% of the country’s total gas capacity. In comparison, the largest gas plant, Lumut Cogen Power Station, has a capacity of 246 MW, making Bukit Panggal about 45% the size of this facility.

Natural gas is the primary fuel source for electricity generation in Brunei, reflecting the country’s abundant natural gas reserves. This resource plays a vital role in meeting the energy needs of the nation. The plant is located approximately 30 km from the capital city, Bandar Seri Begawan, in the Brunei-Muara District.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.