Egypt

Cairo West Power Plant — 2,010 MW Natural Gas

Natural Gas Verified

Cairo West Power Plant is a 2,010 MW gas power plant located in Egypt. View location, capacity, and technical details.

Capacity
2,010 MW

Installed

Commissioned
1996

Year online

Owner
Cairo Electricity Production Company

Operator

Location
30.14, 31.16

Coordinates

Insights

#23
largest in Egypt
#162
largest Natural Gas worldwide
#780
largest worldwide
1996
3 yrs older than avg
11
operated by Cairo Electricity Production…
37
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
2,010 MW
Commissioned
1996
Status
Operational
Owner
Cairo Electricity Production Company
Country
Egypt
Coordinates
30.141, 31.165

Estimated Carbon Footprint

Annual CO₂
3,882,476 t

tonnes / year

Lifetime CO₂
116,474,274 t

over ~30 yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

844,016
cars / year
517,663
homes / year
176,476,173
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Cairo West Power Plant, with a formidable capacity of 2010 megawatts (MW), stands as a significant asset in Egypt’s energy sector. Owned by the Cairo Electricity Production Company, this gas-fired power plant plays a crucial role in supplying electricity to one of the most populous regions in the country, contributing to both residential and industrial energy needs. Established to enhance the reliability and efficiency of the national grid, the plant employs advanced technology and operational practices to ensure a steady supply of power in a nation that has been increasingly focused on addressing its growing energy demands.

Utilizing natural gas as its primary fuel source, the Cairo West Power Plant operates within a framework that emphasizes efficiency and lower emissions compared to traditional coal or oil-fired plants. Natural gas, known for its cleaner combustion properties, releases significantly fewer pollutants, such as sulfur dioxide and particulate matter, when burned. This characteristic not only aligns with global trends towards reducing carbon footprints but also supports Egypt’s commitments to environmental sustainability. The plant is designed to optimize the use of this fuel, incorporating state-of-the-art gas turbines that enhance performance while minimizing waste.

The environmental impact of the Cairo West Power Plant is a critical consideration in its operation. By relying on natural gas, the facility contributes to a reduction in greenhouse gas emissions relative to more carbon-intensive energy sources. However, the extraction and transportation of natural gas can also pose environmental challenges, including potential methane leaks, which are a potent greenhouse gas. Nevertheless, the plant’s operational framework seeks to mitigate these impacts through adherence to rigorous environmental standards and practices aimed at minimizing ecological disturbances.

Regionally, the Cairo West Power Plant is a cornerstone of the Greater Cairo area’s energy infrastructure. As one of the largest power generation facilities in Egypt, its output not only meets local demand but also bolsters the overall stability of the national grid. This is particularly vital as Egypt continues to urbanize and industrialize, resulting in an increased need for reliable energy sources. Moreover, the plant’s strategic location allows it to efficiently distribute electricity to various sectors, playing an integral role in supporting economic growth and development in the region.

In summary, the Cairo West Power Plant represents a vital component of Egypt’s energy strategy. With its significant capacity and reliance on natural gas, it not only addresses immediate energy needs but also aligns with broader environmental goals. As Egypt navigates the complexities of energy production and consumption, facilities like Cairo West will continue to be pivotal in shaping a sustainable and reliable energy future.

More Natural Gas plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.