AGO

Capanda — 520 MW Hydroelectric

Hydroelectric Renewable Verified

Capanda is a 520 MW hydro power plant located in Angola. View location, capacity, and technical details.

Capacity
520 MW

Installed

Commissioned
1989

Year online

Owner
Empresa Pública de Produção de Electricidade

Operator

Location
-9.80, 15.47

Coordinates

Insights

#2
largest in Angola
#699
largest Hydroelectric worldwide
#4,494
largest worldwide
1989
5 yrs newer than avg
4
operated by Empresa Pública de…
0
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
520 MW
Commissioned
1989
Status
Operational
Owner
Empresa Pública de Produção de Electricidade
Country
AGO
Coordinates
-9.796, 15.467
Wikipedia
Link

Carbon Footprint

Annual CO₂
43,730 t

tonnes / year

Lifetime CO₂
3,498,394 t

over ~80 yrs

Intensity
24 g

Est. gCO2/kWh

Annual emissions equivalent to

9,507
cars per year
5,831
homes per year
1,987,724
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Plants

About this plant

The Capanda Hydroelectric Power Plant, located in Angola, stands as a critical component of the country’s energy sector. Commissioned in 1989, this facility has a total capacity of 520 megawatts (MW) and operates under the ownership of the Empresa Pública de Produção de Electricidade, which is a state-owned enterprise responsible for electricity production in Angola. The plant is situated along the Kwanza River, which is a vital water source that supports hydroelectric generation in the region.

As a hydroelectric power plant, Capanda utilizes the kinetic energy of flowing water to generate electricity. The hydropower process involves the conversion of potential energy from water stored in a reservoir into mechanical energy as it flows through turbines. These turbines then convert the mechanical energy into electrical energy. This renewable energy source is increasingly crucial in Angola, where reliance on fossil fuels has been prevalent. The use of hydroelectric power not only reduces dependence on oil and gas but also contributes to a more sustainable energy framework, aligning with global trends toward renewable energy adoption.

The environmental impact of the Capanda Hydroelectric Power Plant is multifaceted. On one hand, hydropower is generally considered a cleaner alternative to fossil fuel-based energy sources, as it produces minimal greenhouse gas emissions during operation. However, the construction of the dam and the creation of the reservoir can lead to significant ecological changes, including alterations to local ecosystems, displacement of communities, and impacts on fish populations. The management of these environmental challenges is essential to ensure that the benefits of the hydropower facility are balanced with ecological conservation efforts.

Regionally, the Capanda power plant plays a significant role in enhancing energy security and supporting economic development in Angola. The plant not only provides electricity to local communities but also contributes to the national grid, helping to stabilize energy supply across the country. This reliability in energy provision is crucial for industrial growth, infrastructure development, and overall socioeconomic advancement. As Angola continues to recover and develop post-civil war, the Capanda plant is a foundational asset that supports both domestic needs and the potential for regional energy exports.

In summary, the Capanda Hydroelectric Power Plant is an essential facility within Angola’s energy landscape, illustrating the country’s commitment to harnessing renewable resources. Its operational capacity contributes significantly to the national electricity supply, while its environmental and regional implications underscore the complexities involved in balancing energy production with ecological stewardship and community well-being.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.