Chile

Carrera Pinto ENEL — 135 MW Solar

Solar Renewable Verified

Carrera Pinto ENEL is a 135 MW solar power plant located in Chile. View location, capacity, and technical details.

Capacity
135 MW

Installed

Commissioned
2016

Year online

Owner
Enel Green Power Chile

Operator

Location
-27.01, -69.87

Coordinates

Insights

#65
largest in %s
#205
largest %s worldwide
#8,840
largest worldwide
2016
at fleet average
14
operated by %s
29
plants within 100 km

Technical Details

Fuel Type
Solar
Capacity
135 MW
Commissioned
2016
Status
Operational
Owner
Enel Green Power Chile
Country
Chile
Coordinates
-27.005, -69.869

Estimated Carbon Footprint

Annual CO₂
8,728 t

tonnes / year

Lifetime CO₂
261,828 t

over ~%d yrs

Intensity
41 g

gCO₂ per kWh

Annual emissions equal to

1,897
cars / year
1,164
homes / year
396,709
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Ranked as the 6th largest solar plant in Chile, the Carrera Pinto ENEL facility holds a significant position within the country’s renewable energy landscape. With a capacity of 135 MW, it contributes approximately 0.43% to Chile’s total installed capacity of 31,543 MW, which is heavily dominated by hydroelectric power. This solar generation facility utilizes advanced photovoltaic technology, harnessing the abundant sunlight that characterizes the region. The plant’s location in the Atacama Desert, one of the sunniest places on Earth, optimizes its operational efficiency and energy output. Situated within a vibrant energy cluster, Carrera Pinto ENEL is surrounded by several other notable solar projects including the Copiapó Solar Project, which boasts a substantial capacity of 390 MW, and Luz del Norte, with a capacity of 141 MW. Other nearby facilities include LLANO DE LLAMPOS (101.02 MW), Carrera Pinto I (97 MW), and Luz del Norte III+ (71 MW). Together, these plants highlight the region’s commitment to solar energy development and significantly bolster the national grid’s capacity. Despite its impressive standing, Carrera Pinto ENEL is part of a broader national context, where hydroelectric power remains the dominant fuel type. Chile’s energy profile is marked by a robust mix of renewable sources, and the Carrera Pinto plant plays a crucial role in diversifying this mix. Operated by ENEL, the facility was commissioned to meet the growing energy demands of the region while promoting sustainable energy practices. Looking forward, Carrera Pinto ENEL not only enhances energy security for Chile but also aligns with the country’s ambitious goals for reducing carbon emissions and increasing the share of renewables in the energy mix.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.