Centrale termoelettrica “Ettore Maiorana” is a 1,340 MW gas power plant located in Italy. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Natural Gas
- Capacity
- 1,340 MW
- Commissioned
- 2010
- Status
- Operational
- Owner
- Enel
- Country
- Italy
- Coordinates
- 37.968, 13.752
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator
Nearby Stations
TERMINI IMERESE C.LE
Italy · Natural Gas
PRIOLO C.LE
Italy · Natural Gas
Archimede combined cycle power plant
Italy · Natural Gas
ISAB ENERGY
Italy · Natural Gas
Anapo hydroelectric power station
Italy · Hydroelectric
ANAPO C.LE
Italy · Hydroelectric
About this plant
The Centrale Termoelettrica ‘Ettore Maiorana’ is a significant gas-fired power plant located in Italy, boasting a total capacity of 1340 megawatts (MW). Owned and operated by Enel, one of the largest energy companies in the world, this facility plays a crucial role in Italy’s energy sector, contributing to the country’s electricity supply and supporting its transition towards cleaner energy sources. The plant utilizes natural gas as its primary fuel, which is known for its relatively lower carbon emissions compared to coal and oil. This fuel type enables the ‘Ettore Maiorana’ plant to provide flexible and efficient power generation, particularly beneficial in balancing the electricity grid during peak demand periods and when renewable energy sources, such as solar and wind, may not be producing sufficient energy.
The technology employed at the ‘Ettore Maiorana’ plant is indicative of modern gas turbine systems, which are designed for high efficiency and lower environmental impact. The combined cycle systems used in the plant allow for the recovery of waste heat generated during electricity production, improving the overall energy conversion efficiency. This technology not only enhances the plant’s output but also reduces fuel consumption and greenhouse gas emissions, making it an integral part of Italy’s strategy to comply with European Union regulations on carbon emissions and to combat climate change.
Environmental considerations are paramount in the operation of the Centrale Termoelettrica ‘Ettore Maiorana.’ While natural gas is cleaner than fossil fuels like coal, the plant still produces emissions that contribute to air pollution. Enel has invested in various measures to minimize the environmental footprint of the facility, including advanced emission control technologies and continuous monitoring systems. Furthermore, the plant’s ability to integrate with renewable energy sources aligns with Italy’s goals for sustainable development and energy independence.
Regionally, the ‘Ettore Maiorana’ power plant is strategically significant, providing a reliable source of electricity to the surrounding areas and supporting local economies. Its ability to respond quickly to fluctuations in electricity demand makes it a vital asset in the context of Italy’s energy transition, particularly as the country increases its reliance on intermittent renewable resources. The plant not only contributes to energy security but also helps stabilize the grid, ensuring that electricity supply meets the growing needs of residential, commercial, and industrial users.
In summary, the Centrale Termoelettrica ‘Ettore Maiorana’ stands as an essential component of Italy’s energy landscape. As the country moves towards a more sustainable energy future, this gas-fired power plant demonstrates the balance between meeting immediate energy demands and addressing long-term environmental goals. Its operation reflects the ongoing evolution of Italy’s energy sector, showcasing the role of modern technology in fostering a cleaner, more efficient power generation system.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.