France

Centre Nucleaire de Production d’Electricite de Cattenom — 5,200 MW Nuclear

Nuclear Verified

Centre Nucleaire de Production d’Electricite de Cattenom is a 5,200 MW nuclear power plant located in France. View location, capacity, and technical details.

Capacity
5,200 MW

Installed

Commissioned
1986

Year online

Owner
EDF

Operator

Location
49.42, 6.22

Coordinates

Insights

#5
largest in France
#26
largest Nuclear worldwide
#74
largest worldwide
1986
2 yrs older than avg
188
operated by EDF
117
plants within 100 km

Technical Details

Fuel Type
Nuclear
Capacity
5,200 MW
Commissioned
1986
Status
Operational
Owner
EDF
Country
France
Coordinates
49.417, 6.220
Wikipedia
Link

Carbon Footprint

Annual CO₂
464,630 t

tonnes / year

Lifetime CO₂
23,231,520 t

over ~50 yrs

Intensity
12 g

Est. gCO2/kWh

Annual emissions equivalent to

101,007
cars per year
61,951
homes per year
21,119,564
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Plants

About this plant

The Centre Nucléaire de Production d’Electricité de Cattenom, located in northeastern France, is one of the country’s key nuclear power plants, boasting a generation capacity of 5200 megawatts (MW). Commissioned in 1986, it is owned and operated by Électricité de France (EDF), the country’s primary electricity utility. This facility plays a vital role in France’s energy sector, contributing significantly to the nation’s electricity supply and helping to maintain energy security. France is known for its reliance on nuclear energy, deriving approximately 70% of its electricity from nuclear sources, and Cattenom is one of the largest contributors to this output.

The Cattenom power plant utilizes nuclear fission as its primary fuel source, specifically uranium-235, which is enriched to facilitate a controlled nuclear reaction. The fission process releases a substantial amount of thermal energy, which is then used to produce steam that drives turbines to generate electricity. The plant is equipped with four reactors, each contributing to the overall output. The reactors are designed to operate with high efficiency and safety standards, adhering to stringent regulations set forth by French nuclear authorities. Technological advancements and regular upgrades have ensured that the plant remains competitive and reliable in meeting national energy demands.

In terms of environmental impact, nuclear power plants like Cattenom are considered to have a lower carbon footprint compared to fossil fuel-based power generation. The operation of the plant does not emit greenhouse gases, which helps France in its commitment to reducing carbon emissions and combating climate change. However, concerns regarding radioactive waste management, the potential for nuclear accidents, and the long-term sustainability of uranium extraction are ongoing debates within the environmental community. The French government has implemented robust safety protocols and waste management strategies to address these issues and ensure the safe operation of nuclear facilities.

Regionally, the Centre Nucléaire de Production d’Electricité de Cattenom is significant not only for its energy output but also for its economic contributions. The plant provides local employment opportunities, supporting both direct jobs within the facility and indirect jobs in surrounding communities. It also contributes to local infrastructure and development, enhancing the overall economic landscape of the region. Additionally, Cattenom’s strategic location near the borders with Luxembourg and Germany positions it as a key player in the European energy market, facilitating cross-border electricity trade and cooperation.

In summary, the Centre Nucléaire de Production d’Electricité de Cattenom stands as a cornerstone of France’s nuclear energy strategy, exemplifying the country’s commitment to sustainable energy production while balancing environmental and economic considerations.

More Nuclear plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.