China

Cgn Xinjiang Tacheng Mayitasi Phase 1 — 49 MW Wind

Wind Renewable Verified

Cgn Xinjiang Tacheng Mayitasi Phase 1 is a 49 MW wind power plant located in China. View location, capacity, and technical details.

Capacity
49 MW

Installed

Commissioned
2015

Year online

Owner
China General Nuclear Power Group

Operator

Location
46.25, 84.09

Coordinates

Insights

#1,942
largest in China
#1,415
largest Wind worldwide
#13,724
largest worldwide
2015
3 yrs newer than avg
35
operated by China General Nuclear…
6
plants within 100 km

Technical Details

Fuel Type
Wind
Capacity
49 MW
Commissioned
2015
Status
Operational
Owner
China General Nuclear Power Group
Country
China
Coordinates
46.247, 84.094

Carbon Footprint

Annual CO₂
1,416 t

tonnes / year

Lifetime CO₂
35,412 t

over ~25 yrs

Intensity
11 g

Est. gCO2/kWh

Annual emissions equivalent to

308
cars per year
189
homes per year
64,386
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Plants

About this plant

Cgn Xinjiang Tacheng Mayitasi Phase 1 is a 49 MW wind power plant in China, operational since its commissioning.

Ranked #90 of 833 wind plants in China, it represents 0.1% of the country’s total wind capacity of 50,905 MW. The largest wind plant in China is the Gansu Wind Farm at 6,000 MW, making this facility 122 times smaller.

The nearest plant is Zhongdiantou Tacheng Mayitasi Phase 1 Wind (49 MW, Wind). This facility is located in Xinjiang, approximately 400 km from Urumqi.

More Wind plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.