Chashma is a 184 MW hydro power plant located in Pakistan. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 184 MW
- Commissioned
- 2001
- Status
- Operational
- Owner
- Water and Power Development Authority (WAPDA)
- Country
- Pakistan
- Coordinates
- 32.435, 71.371
Estimated Carbon Footprint
tonnes / year
over ~80 yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Kalabagh Dam
Pakistan · Hydroelectric
Ghazi-Barotha Hydropower Project
Pakistan · Hydroelectric
Ghazi Barotha
Pakistan · Hydroelectric
Chasnupp
Pakistan · Nuclear
Chashma Nuclear Power Complex
Pakistan · Nuclear
Punjab Thermal Power Plant
Pakistan · Coal
About this plant
Chashma stands out as the 82nd largest power generation facility in Pakistan, contributing 0.19% to the national total capacity of 98,402 MW. With a capacity of 184 MW, it ranks as the 23rd largest hydro power plant among 63 hydro facilities in the country. This designation highlights the importance of hydropower in Pakistan’s energy portfolio, especially given that hydroelectricity is the dominant fuel source, showcasing the nation’s geographical advantages in utilizing its river systems for energy generation.
The Chashma power plant is strategically located near the Chashma Nuclear Power Complex and Chasnupp, both of which boast impressive capacities of 1,330 MW each. This proximity to significant nuclear facilities emphasizes a diverse energy mix within the region, reinforcing the grid’s reliability while balancing the energy supply. Additionally, the Chashma Barrage, also with a capacity of 184 MW, underscores the area’s hydroelectric potential, creating a local energy cluster that optimally utilizes the river systems.
In Pakistan’s energy landscape, where there are a total of 198 plants, Chashma’s contribution is modest yet vital. The country has been evolving its energy infrastructure, with a notable shift towards increasing the share of renewable sources. While hydropower remains the backbone, the presence of nuclear energy offers a complementary capacity that ensures stability during peak demands.
Operated by the Water and Power Development Authority (WAPDA), Chashma was commissioned in 2001. Its ongoing operation illustrates the government’s commitment to harnessing renewable sources of energy while ensuring that the grid remains resilient against fluctuations in demand. Chashma serves not only as a power generation facility but also as a model for future projects aiming to tap into Pakistan’s vast water resources.
As Pakistan continues to face energy challenges, the significance of Chashma may grow as part of a broader strategy aiming for energy security and sustainability. The facility is poised to play an integral role in the national grid, particularly as the country seeks to enhance its renewable energy commitments and reduce dependency on fossil fuels. Looking forward, Chashma exemplifies the potential of hydropower in shaping a greener energy future for Pakistan.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.