Argentina

Corpus Christi Dam — 3,800 MW Hydroelectric

Hydroelectric Renewable Verified

Corpus Christi Dam is a 3,800 MW hydro power plant located in Argentina. View location, capacity, and technical details.

Capacity
3,800 MW

Installed

Commissioned
1980

Year online

Owner
Yacyretá Binational Entity

Operator

Location
-27.10, -55.52

Coordinates

Insights

#1
largest in %s
#34
largest %s worldwide
#205
largest worldwide
1980
%d yrs older than avg
3
operated by %s
6
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
3,800 MW
Commissioned
1980
Status
Operational
Owner
Yacyretá Binational Entity
Country
Argentina
Coordinates
-27.103, -55.521

Estimated Carbon Footprint

Annual CO₂
319,565 t

tonnes / year

Lifetime CO₂
25.6M t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

69,471
cars / year
42,609
homes / year
14.5M
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The Corpus Christi Dam is a significant hydroelectric power plant located in Argentina, boasting a remarkable capacity of 3,800 megawatts (MW). As one of the largest hydroelectric facilities in the country, it plays a crucial role in Argentina’s energy sector, contributing substantially to the national grid and supporting the growing demand for electricity. The plant utilizes the hydroelectric power generation process, which harnesses the energy of flowing water to produce electricity. This process is characterized by the conversion of kinetic energy from water flow into mechanical energy, which is then transformed into electrical energy through turbines and generators. The use of hydroelectric power is particularly advantageous due to its renewable nature, low greenhouse gas emissions, and ability to provide a stable power supply compared to fossil fuels.

The Corpus Christi Dam is strategically important for Argentina, not only providing electricity but also contributing to the country’s energy independence and security. As Argentina increasingly focuses on renewable energy sources to meet its energy needs and reduce reliance on fossil fuels, hydroelectric power represents a vital component of its energy strategy. The plant’s output helps mitigate the challenges posed by fluctuating energy demands and supports the integration of other renewable energy sources, such as wind and solar power, into the national grid.

In terms of environmental impact, hydroelectric plants like Corpus Christi Dam are often viewed as more sustainable alternatives to fossil fuel-based power generation. While the construction of dams can lead to significant ecological changes, including alterations to local waterways and habitats, the overall emissions associated with hydroelectric power are considerably lower than those from coal, oil, or natural gas. Careful management and environmental assessments are crucial in mitigating adverse effects on local ecosystems and ensuring that the dam operates sustainably.

Regionally, the Corpus Christi Dam serves as a vital asset for economic development, particularly in surrounding areas. It provides jobs during both the construction and operational phases, stimulates local economies, and enhances infrastructure. The presence of a large hydroelectric facility can attract additional investments and development initiatives in sectors such as tourism and agriculture, benefiting the local communities.

In summary, the Corpus Christi Dam is an essential part of Argentina’s energy landscape, with a capacity of 3,800 MW derived from hydroelectric power. Its role in promoting renewable energy, fostering economic development, and addressing environmental concerns underscores its significance in both the national and regional context. As Argentina continues to navigate its energy future, the contributions of the Corpus Christi Dam will remain a key factor in achieving a sustainable and resilient energy system.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.