Egypt

El-Atf — 750 MW Natural Gas

Natural Gas Verified

El-Atf is a 750 MW gas power plant located in Egypt. View location, capacity, and technical details.

Capacity
750 MW

Installed

Commissioned
2010

Year online

Owner
Egyptian Electricity Holding Company

Operator

Location
31.19, 30.53

Coordinates

Insights

#54
largest in Egypt
#1,096
largest Natural Gas worldwide
#3,199
largest worldwide
2010
11 yrs newer than avg
61
operated by Egyptian Electricity Holding…
31
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
750 MW
Commissioned
2010
Status
Operational
Owner
Egyptian Electricity Holding Company
Country
Egypt
Coordinates
31.185, 30.529

Carbon Footprint

Annual CO₂
1,448,685 t

tonnes / year

Lifetime CO₂
43,460,550 t

over ~30 yrs

Intensity
490 g

Est. gCO2/kWh

Annual emissions equivalent to

314,932
cars per year
193,158
homes per year
65,849,318
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Plants

About this plant

The El-Atf power plant, located in Egypt, is a significant energy facility with a total capacity of 750 megawatts (MW). This gas-fired power plant plays a crucial role in the country’s energy sector, contributing to the growing demand for electricity in a rapidly developing economy. As Egypt continues to expand its infrastructure and industrial base, the El-Atf plant is pivotal in ensuring energy security and stability, supporting both residential and commercial energy needs.

The El-Atf power plant operates using natural gas as its primary fuel source. Natural gas is considered a cleaner alternative to other fossil fuels, emitting significantly lower quantities of carbon dioxide and other pollutants when burned. This characteristic not only aids in meeting energy demands but also aligns with global trends toward reducing greenhouse gas emissions. The technical specifications of the El-Atf facility reflect modern advancements in gas turbine technology, enabling it to achieve higher efficiency rates and lower operational costs. The combined cycle technology employed at the plant allows for the utilization of exhaust heat from gas turbines, improving overall efficiency and reducing fuel consumption.

In terms of environmental impact, the El-Atf power plant represents a step toward a more sustainable energy future for Egypt. While the use of natural gas is associated with lower emissions compared to coal or oil, the extraction and transportation of natural gas can still pose environmental challenges. However, the plant’s incorporation of advanced emission control technologies helps to mitigate these impacts, ensuring compliance with national and international environmental regulations. The strategic placement of the plant also minimizes disruption to local ecosystems and communities, while providing essential energy resources to a growing population.

Regionally, El-Atf holds significance beyond just its generation capacity. The plant supports Egypt’s strategic initiatives to become a regional energy hub, particularly in the Eastern Mediterranean. With its proximity to major gas reserves and emerging markets, the El-Atf facility is well-positioned to contribute to energy exports, particularly as the country seeks to leverage its natural gas resources. This not only enhances Egypt’s energy independence but also promotes economic growth through potential energy trade agreements with neighboring countries.

In conclusion, the El-Atf power plant is a vital component of Egypt’s energy infrastructure, providing reliable electricity generation through the use of natural gas. Its technical advancements, commitment to reducing environmental impacts, and regional economic significance underscore its role as a cornerstone of the nation’s energy strategy. As Egypt continues to navigate its energy challenges, El-Atf stands as a testament to the country’s efforts to balance growth, sustainability, and regional cooperation.

More Natural Gas plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.