El Chocón Dam is a 1,200 MW hydro power plant located in Argentina. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 1,200 MW
- Commissioned
- 1979
- Status
- Operational
- Owner
- Energía del Sur S.A.
- Country
- Argentina
- Coordinates
- -39.266, -68.757
- Wikipedia
- Link
Estimated Carbon Footprint
tonnes / year
over ~80 yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Represa Hidroeléctrica Piedra del Águila
Argentina · Hydroelectric
EL CHOCON
Argentina · Hydroelectric
Central Térmica Loma de la Lata
Argentina · Natural Gas
Loma de la Lata Power Plant
Argentina · Natural Gas
CENTRAL LOMA DE LA LATA SA
Argentina · Natural Gas
AGUA DEL CAJON (AUTOGENERADOR DEL MEM)
Argentina · Other
About this plant
The El Chocón Dam, located on the Limay River in the Neuquén province of Argentina, is a significant hydroelectric power plant with an installed capacity of 1200 megawatts (MW). Commissioned in 1972, the dam plays a crucial role in the Argentine energy sector, providing a substantial portion of the country’s electricity. As a hydroelectric facility, the El Chocón Dam harnesses the kinetic energy of flowing water to generate electricity, utilizing the natural gradient of the river. This renewable energy source is vital for Argentina, a nation that has been increasingly focusing on sustainable energy solutions amid growing energy demands and environmental concerns.
The technology employed at the El Chocón Dam involves the construction of a large concrete gravity dam that creates a reservoir with a capacity of approximately 3.3 billion cubic meters of water. This reservoir allows for water storage during periods of high flow, ensuring a consistent supply for electricity generation year-round. The facility’s turbines convert the potential energy from stored water into mechanical energy, which is then transformed into electrical energy via generators. The power generated at El Chocón is integrated into the national grid, significantly contributing to the stability and reliability of Argentina’s electricity supply.
Hydropower, as a fuel type, is characterized by its low greenhouse gas emissions compared to fossil fuels. The El Chocón Dam exemplifies the advantages of renewable energy, as it does not produce air pollutants or contribute to climate change in the same way that coal or natural gas plants do. However, the environmental impact of such large-scale hydroelectric projects can also be significant. The construction of the dam and its reservoir has altered local ecosystems, impacting fish populations and other wildlife habitats. The flooding of land for the reservoir has displaced communities and changed the landscape of the region, raising concerns about biodiversity and sustainable management of natural resources.
Regionally, the El Chocón Dam is of great importance not only for its energy output but also for its role in local economic development. The facility provides jobs, supports local businesses, and fosters economic growth in the Neuquén province. Moreover, it serves as a vital component of the Argentine energy matrix, which includes a mix of hydro, thermal, and renewable energy sources. As Argentina seeks to enhance its energy independence and reduce its reliance on imported fuels, hydroelectric power from projects like El Chocón will remain essential. The dam’s ability to generate clean energy aligns with global trends toward sustainable practices and climate change mitigation, positioning it as a key player in Argentina’s transition to a more sustainable energy future.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.