Venezuela

Fabricio Ojeda (La Vueltosa) Hydroelectric Power Plant Venezuela — 514 MW Hydroelectric

Hydroelectric Renewable Verified

Fabricio Ojeda (La Vueltosa) Hydroelectric Power Plant Venezuela is a 514 MW hydro power plant located in Venezuela. View location, capacity, and technical details.

Capacity
514 MW

Installed

Commissioned
2011

Year online

Owner
La Electricidad de Caracas (EDC)

Operator

Location
7.75, -71.47

Coordinates

Insights

#10
largest in Venezuela
#709
largest Hydroelectric worldwide
#4,529
largest worldwide
2011
27 yrs newer than avg
1
operated by La Electricidad de…
2
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
514 MW
Commissioned
2011
Status
Operational
Owner
La Electricidad de Caracas (EDC)
Country
Venezuela
Coordinates
7.747, -71.467

Estimated Carbon Footprint

Annual CO₂
43,225 t

tonnes / year

Lifetime CO₂
3,458,028 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

9,397
cars / year
5,763
homes / year
1,964,788
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The Fabricio Ojeda Hydroelectric Power Plant, commonly known as La Vueltosa, is a significant energy facility located in Venezuela. With an installed capacity of 514 megawatts (MW), this power plant plays a crucial role in the country’s energy sector, contributing to the national grid and helping to meet the electricity demands of both urban and rural areas. Commissioned in 2011, the plant is owned and operated by La Electricidad de Caracas (EDC), a state-owned enterprise responsible for electricity distribution and generation in the region.

La Vueltosa utilizes hydroelectric power as its primary fuel source, harnessing the kinetic energy of flowing water to generate electricity. The plant is strategically situated in a region with ample water resources, allowing it to effectively convert the potential energy of elevated water into electrical energy. This process involves the use of turbines that are turned by the movement of water, which in turn drives generators to produce electricity. Hydropower is considered a renewable energy source, as it relies on the natural water cycle and does not deplete resources or generate greenhouse gases during operation.

The environmental impact of the Fabricio Ojeda Hydroelectric Power Plant is generally considered to be less harmful compared to fossil fuel-based power generation. However, like all large hydroelectric projects, it can have significant ecological implications. The construction of the plant may have altered local ecosystems, affected fish migration patterns, and displaced communities or wildlife. Nevertheless, hydropower remains a cleaner alternative to conventional energy sources, aiding in the reduction of carbon emissions and air pollution associated with burning fossil fuels.

Regionally, La Vueltosa holds significant importance in supporting Venezuela’s energy infrastructure. The country has faced various challenges in its energy sector, including fluctuations in oil prices, economic sanctions, and political instability, leading to increased reliance on alternative energy sources. The contribution of the Fabricio Ojeda Hydroelectric Power Plant helps diversify Venezuela’s energy portfolio and promotes energy security, enabling a more stable supply of electricity for the population.

In summary, the Fabricio Ojeda (La Vueltosa) Hydroelectric Power Plant stands as a vital asset in Venezuela’s energy landscape. With its capacity to generate 514 MW of electricity through renewable hydroelectric power, it plays a key role in meeting the energy needs of the country while contributing to a more sustainable energy future. Its operational and environmental dynamics reflect the broader challenges and opportunities facing the nation as it seeks to enhance its energy infrastructure.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.