SVK

Gabcikovo Hydroelectric Power Plant Slovakia — 720 MW Hydroelectric

Hydroelectric Renewable Verified

Gabcikovo Hydroelectric Power Plant Slovakia is a 720 MW hydro power plant located in Slovakia. View location, capacity, and technical details.

Capacity
720 MW

Installed

Commissioned
1992

Year online

Owner
Slovenské elektrárne

Operator

Location
47.88, 17.54

Coordinates

Insights

#5
largest in %s
#530
largest %s worldwide
#3,304
largest worldwide
1992
%d yrs newer than avg
22
operated by %s
16
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
720 MW
Commissioned
1992
Status
Operational
Owner
Slovenské elektrárne
Country
SVK
Coordinates
47.880, 17.538

Estimated Carbon Footprint

Annual CO₂
60,549 t

tonnes / year

Lifetime CO₂
4.8M t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

13,163
cars / year
8,073
homes / year
2.8M
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The Gabcikovo Hydroelectric Power Plant, located on the Danube River in Slovakia, stands as a significant contributor to the country’s energy sector with a total installed capacity of 720 megawatts (MW). Commissioned in 1992, it plays a critical role in Slovakia’s energy production, particularly in the realm of renewable resources. This hydroelectric facility harnesses the kinetic energy of flowing water to generate electricity, making it a pivotal player in the nation’s transition towards sustainable energy solutions.

The primary fuel type utilized by the Gabcikovo Power Plant is hydroelectric energy, which is derived from the gravitational force of flowing water. The plant operates by channeling river water through turbines, which subsequently converts the kinetic energy of the water into mechanical energy, and then into electrical energy. This process not only provides a renewable source of electricity but also ensures a consistent and reliable power supply, given the stability of hydropower compared to other renewable sources like wind or solar. With a substantial capacity of 720 MW, Gabcikovo is one of the largest hydroelectric power plants in Slovakia, significantly contributing to the national grid and helping to meet the country’s energy demands.

In terms of environmental impact, the Gabcikovo Hydroelectric Power Plant has both positive and negative implications. On one hand, it generates electricity without emitting greenhouse gases during operation, thus supporting Slovakia’s goals for reducing carbon emissions and combating climate change. On the other hand, the construction of the dam and the alteration of the natural flow of the Danube River have led to ecological changes in the local environment, affecting riverine habitats and aquatic biodiversity. Mitigation measures have been implemented to address these environmental challenges, including fish passages and habitat restoration projects aimed at preserving local ecosystems.

Regionally, the Gabcikovo Power Plant has significant importance. It not only provides electricity to Slovakia but also contributes to energy security in Central Europe. By stabilizing the grid and providing a reliable source of energy, it supports both industrial and residential consumers. Additionally, the plant plays a role in flood control and irrigation management, as the dam regulates river flow, thereby reducing the risk of flooding in downstream areas. This multifaceted functionality underscores the plant’s value, not just as a power generator, but also as an essential infrastructure component for regional development.

In conclusion, the Gabcikovo Hydroelectric Power Plant is a vital asset in Slovakia’s energy landscape. Its capacity to produce renewable energy, coupled with its regional significance in terms of environmental management and energy security, solidifies its role as a cornerstone of the nation’s approach to sustainable development.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.