Russia

GES-1 of the Cascade of the Kuban HPPs — 37 MW Hydroelectric

Hydroelectric Renewable Verified

GES-1 of the Cascade of the Kuban HPPs is a 37 MW hydro power plant located in Russia. View location, capacity, and technical details.

Capacity
37 MW

Installed

Commissioned

Year online

Owner
PJSC "RusHydro"

Operator

Location
44.28, 42.47

Coordinates

Insights

#425
largest in Russia
#3,592
largest Hydroelectric worldwide
#15,600
largest worldwide
53
operated by PJSC "RusHydro"
13
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
37 MW
Commissioned
Status
Operational
Owner
PJSC "RusHydro"
Country
Russia
Coordinates
44.276, 42.472

Carbon Footprint

Annual CO₂
3,112 t

tonnes / year

Lifetime CO₂
248,924 t

over ~80 yrs

Intensity
24 g

Est. gCO2/kWh

Annual emissions equivalent to

676
cars per year
415
homes per year
141,434
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Plants

About this plant

GES-1 of the Cascade of the Kuban HPPs is a 37 MW hydro power plant in Russia, operated by PJSC “RusHydro”.

Ranked #72 of 112 hydro plants in Russia, it constitutes 0.08% of the country’s total hydro capacity of 48,889 MW. The largest hydro plant in Russia is Krasnoyarsk at 6,000 MW, making GES-1 162.2 times smaller.

Nearby plants within 50 km include HPP-2 of the Cascade of the Kuban HPPs (184 MW, Hydro), GES-3 of the Cascade of Kuban HPPs (87 MW, Hydro), and HPP-4 of the Cascade of Kuban HPPs (78 MW, Hydro). The facility is located in the Krasnodar Krai region.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.