Governador Jayme Canet Júnior – GJC (Antiga Mauá) — 363 MW Hydroelectric
Governador Jayme Canet Júnior – GJC (Antiga Mauá) is a 363 MW hydro power plant located in Brazil. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 363 MW
- Commissioned
- 2012
- Status
- Operational
- Owner
- Companhia Energética de Minas Gerais (CEMIG)
- Country
- Brazil
- Coordinates
- -24.062, -50.706
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Capivara (Escola de Engenharia Mackenzie)
Brazil · Hydroelectric
Chavantes
Brazil · Hydroelectric
Usina Hidreletrica de Chavantes
Brazil · Hydroelectric
Klabin Celulose
Brazil · Biomass
Jurumirim (Armando Avellanal Laydner)
Brazil · Hydroelectric
Canoas I
Brazil · Hydroelectric
About this plant
The Governador Jayme Canet Júnior – GJC hydroelectric power plant, formerly known as Mauá, plays a pivotal role in Brazil’s energy landscape. Commissioned in 2012, this facility boasts a substantial capacity of approximately 363.14 MW, contributing significantly to the national grid and helping to fulfill Brazil’s growing energy demands. Located at coordinates -24.0622, -50.7064, in a region characterized by abundant water resources, the plant harnesses the power of flowing water through advanced hydroelectric technology, providing clean and renewable energy. As a hydro plant, it utilizes a dam-based system to convert the kinetic energy of water into electricity, aligning with Brazil’s commitment to sustainable energy generation. The GJC plant is integral to the local energy mix, supporting both residential and industrial sectors by supplying reliable power. Its operational context is enhanced by Brazil’s energy policies that prioritize renewable energy sources, positioning hydroelectric plants like GJC as key players in achieving national sustainability goals. The facility not only reduces reliance on fossil fuels but also helps stabilize the electricity supply in the region, making it a cornerstone of the local grid. The operator’s commitment to efficient and eco-friendly practices ensures that Governador Jayme Canet Júnior continues to serve as a model for future hydroelectric projects in Brazil.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.