Brazil

Governador Ney Aminthas de Barros Braga (Segredo) — 1,260 MW Hydroelectric

Hydroelectric Renewable Verified

Governador Ney Aminthas de Barros Braga (Segredo) is a 1,260 MW hydro power plant located in Brazil. View location, capacity, and technical details.

Capacity
1,260 MW

Installed

Commissioned
1992

Year online

Owner
Eletrobras

Operator

Location
-25.78, -52.13

Coordinates

Insights

#42
largest in Brazil
#220
largest Hydroelectric worldwide
#1,730
largest worldwide
1992
8 yrs newer than avg
63
operated by Eletrobras
49
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
1,260 MW
Commissioned
1992
Status
Operational
Owner
Eletrobras
Country
Brazil
Coordinates
-25.783, -52.133

Carbon Footprint

Annual CO₂
105,961 t

tonnes / year

Lifetime CO₂
8,476,877 t

over ~80 yrs

Intensity
24 g

Est. gCO2/kWh

Annual emissions equivalent to

23,035
cars per year
14,128
homes per year
4,816,407
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Plants

About this plant

The Governador Ney Aminthas de Barros Braga Hydroelectric Power Plant, commonly known as the Segredo Power Plant, is a significant hydroelectric facility located in Brazil. Commissioned in 1992, this power plant boasts an impressive generation capacity of 1260 megawatts (MW), making it one of the key contributors to the country’s energy sector. Situated on the Iguaçu River in the state of Paraná, the Segredo Power Plant plays a vital role in meeting Brazil’s growing demand for electricity, particularly in the southern region of the country, which has a diverse industrial base and a rapidly increasing population.

As a hydroelectric power plant, Segredo utilizes the kinetic energy of flowing water to generate electricity. This process involves capturing water from the Iguaçu River, which is then directed through turbines that convert the mechanical energy of the moving water into electrical energy. Hydro power is considered one of the most efficient and cleanest forms of renewable energy, as it generates electricity without the direct emission of greenhouse gases. The Segredo Power Plant, through its capacity to harness the natural flow of the river, exemplifies the advantages of hydroelectricity in providing stable and reliable energy supply to the grid.

In terms of environmental impact, hydroelectric power plants like Segredo are generally perceived as more environmentally friendly compared to fossil fuel-based power generation. However, the construction and operation of large dams can lead to ecological disturbances, including alterations to local ecosystems, fish migration patterns, and potential flooding of surrounding areas. In the case of the Segredo Power Plant, efforts have been made to minimize these impacts through environmental management programs and initiatives aimed at preserving biodiversity in the region.

Regionally, the Segredo Power Plant holds significant importance not just for its energy production capabilities but also for its contribution to local economies. The availability of a stable electrical supply supports industries, businesses, and residential areas, facilitating economic development and improving quality of life for residents. Furthermore, the plant serves as a source of employment for many individuals in the area, from construction and maintenance to administrative roles.

Overall, the Governador Ney Aminthas de Barros Braga Hydroelectric Power Plant represents a critical asset in Brazil’s energy landscape. By providing a substantial amount of renewable energy, it helps the country in its transition towards more sustainable energy practices, while also addressing the energy needs of its population and industries. The ongoing commitment to balancing energy production with environmental stewardship ensures that the Segredo Power Plant remains a key player in Brazil’s energy future.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.