Hai Phong 2 — 600 MW Coal

Coal Verified

Hai Phong 2 is a 600 MW coal power plant located in Vietnam. View location, capacity, and technical details.

Capacity
600 MW

Installed

Commissioned
2010

Year online

Owner
Vietnam Electricity (EVN)

Operator

Location
20.94, 106.76

Coordinates

Insights

#38
largest in Vietnam
#1,357
largest Coal worldwide
#3,989
largest worldwide
2010
13 yrs newer than avg
49
operated by Vietnam Electricity (EVN)
23
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
600 MW
Commissioned
2010
Status
Operational
Owner
Vietnam Electricity (EVN)
Country
Vietnam
Coordinates
20.939, 106.757

Estimated Carbon Footprint

Annual CO₂
2,370,456 t

tonnes / year

Lifetime CO₂
94,818,240 t

over ~40 yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

515,317
cars / year
316,061
homes / year
107,748,000
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Hai Phong 2 Power Plant, with a capacity of 600 megawatts (MW), is a significant coal-fired power facility located in Hai Phong, Vietnam. Owned and operated by Vietnam Electricity (EVN), this power plant plays a crucial role in the country’s energy sector, contributing to the growing demand for electricity in Vietnam, which is experiencing rapid industrialization and urbanization. As one of the key assets in EVN’s portfolio, Hai Phong 2 is instrumental in ensuring a stable and reliable supply of electricity to meet the needs of both residential and commercial consumers in the region.

The power plant utilizes coal as its primary fuel, which is a common choice for energy generation in many countries, including Vietnam. Coal remains an important part of the energy mix due to its availability and cost-effectiveness. The technology employed at Hai Phong 2 likely includes modern combustion methods designed to optimize efficiency and reduce operational costs. However, coal combustion is associated with various technical considerations, including the management of emissions and the efficiency of the conversion process. The plant’s design and operational protocols are likely focused on achieving a balance between productivity and environmental responsibility.

Environmental impacts are a critical concern associated with coal-fired power plants. Hai Phong 2, like many such facilities, faces scrutiny regarding its emissions of greenhouse gases, particulate matter, and other pollutants. The Vietnamese government has been increasingly focused on transitioning to cleaner energy sources in response to both domestic and international pressures to reduce carbon emissions. As a result, efforts may be underway at Hai Phong 2 to incorporate cleaner technologies and practices, such as flue gas desulfurization and particulate control systems, to minimize its environmental footprint. Nevertheless, coal remains a significant contributor to air pollution and climate change, which raises ongoing concerns about the sustainability of its use in the long term.

Regionally, the Hai Phong 2 Power Plant is of strategic importance as it supports the economic growth of northern Vietnam. Hai Phong is a major port city, and the availability of reliable electricity is essential for industrial operations and infrastructure development in the area. The power generated by Hai Phong 2 not only serves local demand but also contributes to the broader national grid, helping to stabilize electricity supply across northern Vietnam. As the country continues to develop, the role of coal-fired power plants like Hai Phong 2 is likely to be reevaluated in the context of Vietnam’s commitment to sustainable energy goals and the integration of renewable energy sources into the energy mix. In conclusion, the Hai Phong 2 Power Plant stands as a vital component of Vietnam’s energy infrastructure, reflecting the ongoing challenges and opportunities within the coal energy sector amidst a changing global landscape.