SRB

HE BAJINA BASTA — 420 MW Hydroelectric

Hydroelectric Renewable Verified

HE BAJINA BASTA is a 420 MW hydro power plant located in Serbia. View location, capacity, and technical details.

Capacity
420 MW

Installed

Commissioned
2010

Year online

Owner
EPS (Elektroprivreda Srbije)

Operator

Location
43.96, 19.41

Coordinates

Insights

#8
largest in %s
#832
largest %s worldwide
#5,099
largest worldwide
2010
%d yrs newer than avg
3
operated by %s
10
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
420 MW
Commissioned
2010
Status
Operational
Owner
EPS (Elektroprivreda Srbije)
Country
SRB
Coordinates
43.965, 19.410

Estimated Carbon Footprint

Annual CO₂
35,320 t

tonnes / year

Lifetime CO₂
2.8M t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

7,678
cars / year
4,709
homes / year
1.6M
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

HE BAJINA BASTA is a prominent hydroelectric power station located in Serbia at coordinates 43.9645 latitude and 19.4102 longitude. With a generation capacity of 420 MW, this power plant plays a crucial role in the national energy landscape, significantly contributing to Serbia’s electricity supply. The facility employs advanced hydroelectric technology, effectively utilizing water flow to generate clean, renewable energy. This aligns with Serbia’s energy policy objectives, which focus on increasing the share of renewable energy sources in the national mix. The operational significance of HE BAJINA BASTA extends beyond energy generation; it also supports local economic growth and provides a reliable power supply to the surrounding communities. As Serbia continues to enhance its energy infrastructure, this hydroelectric plant is pivotal in achieving sustainability and energy efficiency goals.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.