Huadian Jurong power station is a 2,000 MW coal power plant located in China. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Coal
- Capacity
- 2,000 MW
- Commissioned
- 2016
- Status
- Operational
- Owner
- Huadian Power International Company Limited
- Country
- China
- Coordinates
- 32.195, 119.249
Carbon Footprint
tonnes / year
over ~40 yrs
Est. gCO2/kWh
Annual emissions equivalent to
Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator
Nearby Plants
Guodian Taizhou power station
China · Coal
Ligang power station
China · Coal
Zhangjiagang Shazhou power station
China · Coal
Jianbi power station
China · Coal
WEnergy Maanshan Power Station
China · Coal
Tongling Wanneng power station
China · Coal
About this plant
The Huadian Jurong power station, commissioned in 2016, is a significant coal-fired power plant located in Jiangsu Province, China. With a total installed capacity of 2000 megawatts (MW), it is one of the major energy facilities owned by Huadian Power International Company Limited, a subsidiary of Huadian Corporation. The power station plays a crucial role in supporting China’s growing energy needs, particularly as the country continues to industrialize and urbanize at a rapid pace.
As a coal-fired power plant, Huadian Jurong utilizes coal as its primary fuel source, which is abundant and widely accessible in China. The plant employs modern combustion technologies designed to enhance efficiency and reduce emissions. Despite coal being a traditional energy source, advancements in technology have allowed for the implementation of emission control systems that aim to minimize the environmental impact typical of coal combustion. However, it is important to note that coal-fired power plants, including Huadian Jurong, contribute to significant carbon dioxide (CO2) emissions, which are a primary driver of climate change.
In the context of China’s energy sector, the Huadian Jurong power station contributes to the national grid by providing a stable and reliable source of electricity. It helps meet the electricity demands of both residential and industrial consumers, thereby playing a vital role in the country’s economic development. The plant’s capacity is particularly crucial during peak demand periods, ensuring that energy supply meets the needs of a growing population and expanding industries.
The environmental implications of the Huadian Jurong power station and similar coal-fired plants are a subject of ongoing debate. While the station incorporates advanced technologies aimed at reducing particulate matter and sulfur dioxide (SO2) emissions, coal remains a fossil fuel that poses challenges for air quality and public health. The Chinese government has acknowledged these issues and is actively working towards a transition to cleaner energy sources, such as renewables and natural gas, as part of its commitment to reducing carbon emissions.
Regionally, the Huadian Jurong power station holds significance as it supports local economic growth by providing jobs and fostering infrastructure development. The facility is strategically located to benefit from the extensive coal supply network in China, allowing for efficient fuel transportation and delivery. As Jiangsu Province is one of the most industrialized regions in China, the power station’s electricity generation is critical to sustaining the operations of numerous factories and businesses in the area.
In summary, the Huadian Jurong power station represents a critical component of China’s energy infrastructure, balancing the demands for electricity with the challenges of environmental sustainability. As the country moves towards a greener energy future, the role of such coal-fired power plants will continue to be scrutinized and reassessed in light of national and global energy policies.
More Coal plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.