Paraguay

Itaipu Binacional Dam (Paraguay part) — 7,000 MW Hydroelectric

Hydroelectric Renewable Verified

Itaipu Binacional Dam (Paraguay part) is a 7,000 MW hydro power plant located in Paraguay. View location, capacity, and technical details.

Capacity
7,000 MW

Installed

Commissioned
1984

Year online

Owner
Brazil and Paraguay Government

Operator

Location
-25.41, -54.59

Coordinates

Insights

#1
largest in Paraguay
#14
largest Hydroelectric worldwide
#22
largest worldwide
1984
at fleet average
1
operated by Brazil and Paraguay…
8
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
7,000 MW
Commissioned
1984
Status
Operational
Owner
Brazil and Paraguay Government
Country
Paraguay
Coordinates
-25.408, -54.589

Estimated Carbon Footprint

Annual CO₂
588,672 t

tonnes / year

Lifetime CO₂
47,093,760 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

127,972
cars / year
78,490
homes / year
26,757,818
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The Itaipu Binacional Dam, located on the Paraná River along the border between Brazil and Paraguay, is one of the largest hydroelectric power plants in the world. The Paraguay segment of the dam has a capacity of 7,000 megawatts (MW) and was commissioned in 1984. This monumental piece of engineering is owned jointly by the governments of Brazil and Paraguay, reflecting a significant cooperative venture in energy production and management between the two nations.

As a hydroelectric facility, the Itaipu Dam harnesses the kinetic energy of flowing water to generate electricity. The dam’s operation relies on the potential energy created by the height difference between the water in the reservoir and the turbines located within the facility. Water is channeled through turbines, which spin and activate generators to produce electricity. The Itaipu Dam is notable not only for its immense capacity but also for its efficiency and reliability as a renewable energy source. It has been a cornerstone of Paraguay’s energy sector, providing the country with around 90% of its electricity needs, while also supplying significant power to Brazil.

The environmental impact of the Itaipu Binacional Dam has been a subject of discussion since its construction. While hydroelectric power is generally considered a cleaner alternative to fossil fuels, the dam’s creation led to the flooding of a large area of land, resulting in the displacement of thousands of residents and the submergence of ecosystems. However, the dam also includes initiatives to mitigate negative environmental effects, such as reforestation projects and conservation efforts for local wildlife. The construction of the dam has also contributed to improved water quality downstream, as the reservoir helps to regulate river flow and sediment transport.

Regionally, the Itaipu Binacional Dam represents a crucial energy nexus for both Paraguay and Brazil. It not only provides electricity but also fosters economic cooperation and integration between the two countries. The energy generated at Itaipu is vital for industrial growth and development in both nations, helping to stabilize regional energy prices and contributing to energy security. Furthermore, the dam has become a symbol of technological achievement and bilateral collaboration, showcasing how shared resources can lead to mutual benefits and sustainable development.

In summary, the Itaipu Binacional Dam is a significant hydroelectric power plant that plays a pivotal role in Paraguay’s energy landscape. With a capacity of 7,000 MW, it stands as a testament to the potential of renewable energy sources while highlighting the complexities of environmental and social impacts associated with large-scale infrastructure projects. Its continued operation and management are essential for the economic vitality and energy independence of both Paraguay and Brazil.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.