United Arab Emirates

Jebel Ali “E” — 616 MW Natural Gas

Natural Gas Verified

Jebel Ali “E” is a 616 MW gas power plant located in United Arab Emirates. View location, capacity, and technical details.

Capacity
616 MW

Installed

Commissioned
1989

Year online

Owner
DEWA

Operator

Location
25.06, 55.12

Coordinates

Insights

#42
largest in %s
#1,393
largest %s worldwide
#3,939
largest worldwide
1989
%d yrs older than avg
12
operated by %s
54
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
616 MW
Commissioned
1989
Status
Operational
Owner
DEWA
Country
United Arab Emirates
Coordinates
25.060, 55.118

Estimated Carbon Footprint

Annual CO₂
1.2M t

tonnes / year

Lifetime CO₂
35.7M t

over ~%d yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

258,664
cars / year
158,647
homes / year
54.1M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Jebel Ali ‘E’ Power Plant, with a generation capacity of 616 megawatts (MW), is a significant facility in the United Arab Emirates’ energy landscape. Commissioned in 1989 and owned by the Dubai Electricity and Water Authority (DEWA), this gas-fired power plant plays a crucial role in meeting the electricity demands of Dubai and its surrounding regions. As a part of the broader Jebel Ali complex, which includes several other generation units, Jebel Ali ‘E’ has been instrumental in supporting the rapid economic growth and urbanization of Dubai, a key city in the UAE.

The plant primarily utilizes natural gas as its fuel source, which is an essential component of the UAE’s energy portfolio. Natural gas is favored for its relatively lower carbon emissions compared to other fossil fuels, making it a more environmentally friendly option. The technology employed in the Jebel Ali ‘E’ Power Plant includes combined cycle gas turbines, which enhance efficiency by utilizing the waste heat produced during electricity generation to produce additional power. This method not only improves the overall energy output of the plant but also helps to optimize fuel consumption, thereby reducing operational costs and environmental impact.

In terms of environmental considerations, while the Jebel Ali ‘E’ Power Plant operates on a cleaner fuel source compared to coal or oil, it still contributes to greenhouse gas emissions. DEWA has been actively working on various measures to mitigate the environmental footprint of its operations. These include investing in renewable energy projects and adopting advanced technologies that reduce emissions and enhance energy efficiency. The UAE government has set ambitious goals to diversify its energy sources and reduce reliance on fossil fuels, aiming for a more sustainable energy future.

Regionally, the Jebel Ali ‘E’ Power Plant holds strategic importance, not only for its contribution to the local grid but also for its role in supporting the broader GCC (Gulf Cooperation Council) electricity market. The plant provides stability to the region’s energy supply, particularly during peak demand periods, which are common in the hot summer months. Furthermore, the facility plays a part in bolstering the UAE’s energy security by utilizing domestic natural gas resources, thereby reducing dependence on imported fuels.

In summary, the Jebel Ali ‘E’ Power Plant is a vital asset in the UAE’s energy sector, combining technical efficiency with environmental considerations. As the country moves toward a more sustainable energy future, the lessons learned and infrastructure developed through plants like Jebel Ali ‘E’ will be essential in shaping the next generation of energy production in the region.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.