JINAMAR 10 GAS 2 is a 234 MW oil power plant located in Spain. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Oil
- Capacity
- 234 MW
- Commissioned
- 1989
- Status
- Operational
- Owner
- UNION ELECTRICA DE CANARIAS GENERACION S.A.U.
- Country
- Spain
- Coordinates
- 28.042, -15.411
Estimated Carbon Footprint
tonnes / year
over ~30 yrs
gCO₂ per kWh
Annual emissions equal to
Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator
Nearby Stations
Central Térmica Barranco de Tirajana
Spain · Oil
GRANADILLA 1 GAS 1
Spain · Oil
BARRANCO DE TIRAJANA 7 VAPOR 3 (CC1)
Spain · Oil
Central térmica de Jinámar
Spain · Oil
Central Eléctrica de Caletillas
Spain · Oil
CANDELARIA 9 VAPOR 5
Spain · Oil
About this plant
As the 120th largest power generation facility in Spain, JINAMAR 10 GAS 2 is a significant contributor to the Canary Islands’ energy matrix, accounting for 0.19% of the national capacity of 122,104 MW. With a capacity of 234.46 MW, it ranks as the 9th largest oil-powered plant among 30 oil facilities in the country. This positioning reflects its essential role in a region where energy security is paramount, given the islands’ geographical isolation from the mainland. The facility employs oil as its primary fuel, a choice that aligns with the historical energy profile of the Canary Islands, where gas remains the dominant fuel type across the broader Spanish energy landscape. JINAMAR 10 GAS 2 is strategically located near several other significant plants, including the Central Térmica Barranco de Tirajana, which boasts a capacity of 697 MW, and the BARRANCO DE TIRAJANA 7 VAPOR 3 (CC1) at 646.26 MW. This proximity to larger facilities enhances the local energy infrastructure, allowing for efficient power distribution and backup capabilities. In the context of Spain’s overall energy profile, where gas is the leading fuel, the role of oil plants like JINAMAR 10 GAS 2 becomes essential, particularly in balancing the grid during peak demand periods. Operated by UNION ELECTRICA DE CANARIAS GENERACION S.A.U. and commissioned in 1989, the plant is a critical asset in the local energy landscape. As Spain continues to push towards renewable energy integration, the adaptability of oil facilities like JINAMAR 10 GAS 2 will be vital in transitioning to a more sustainable energy future while ensuring that energy demands are consistently met.
More Oil plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.