Kent Hills 1 / 2 is a 150 MW wind power plant located in Canada. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Wind
- Capacity
- 150 MW
- Commissioned
- 2009
- Status
- Operational
- Owner
- TransAlta (83%)
- Country
- Canada
- Coordinates
- 45.819, -64.889
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
About this plant
Kent Hills 1 / 2 is recognized as the 212th largest power generation facility in Canada, amidst a total of 1,334 plants, highlighting its role in the national energy landscape. With a capacity of 150 MW, this wind power facility contributes approximately 0.08% of Canada’s total energy capacity of 193,190 MW, where hydroelectric sources dominate. Among the wind sector, Kent Hills 1 / 2 ranks as the 15th largest of 275 wind plants, showcasing its significance within this growing renewable energy segment. Utilizing state-of-the-art wind turbine technology, the facility transforms wind energy into electricity, providing a sustainable and eco-friendly alternative to traditional fossil fuels. Interestingly, Kent Hills 1 / 2 is located within a wind energy cluster, although it is unique in that the nearest power generation facility, the Kent Hills Wind Farm, has a capacity of 0 MW, indicating a potential room for future development in the area. This geographic context enhances the potential for wind energy generation in the region, making Kent Hills 1 / 2 a vital player in establishing a reliable renewable energy supply. In the broader national context, Canada has a robust energy profile dominated by hydroelectric power, yet the increasing incorporation of wind energy is crucial for diversifying the energy mix. The role of Kent Hills 1 / 2 is vital, especially as the country aims to meet its renewable energy goals and reduce carbon emissions. Owned and operated predominantly by TransAlta, this facility has been operational since its commissioning. As Canada pushes towards a greener energy future, Kent Hills 1 / 2 is positioned to make significant contributions to both the local energy ecosystem and national sustainability objectives. Its ongoing generation capacity not only supports local energy needs but also reinforces Canada’s commitment to renewable energy development and economic resilience.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.