India

KUNDAH I-V — 555 MW Hydroelectric

Hydroelectric Renewable Verified

KUNDAH I-V is a 555 MW hydro power plant located in India. View location, capacity, and technical details.

Capacity
555 MW

Installed

Commissioned
1966

Year online

Owner
Tamil Nadu Generation and Distribution Corporation

Operator

Location
11.29, 76.65

Coordinates

Insights

#283
largest in India
#670
largest Hydroelectric worldwide
#4,345
largest worldwide
1966
18 yrs older than avg
18
operated by Tamil Nadu Generation…
33
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
555 MW
Commissioned
1966
Status
Operational
Owner
Tamil Nadu Generation and Distribution Corporation
Country
India
Coordinates
11.286, 76.651

Estimated Carbon Footprint

Annual CO₂
46,673 t

tonnes / year

Lifetime CO₂
3,733,862 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

10,146
cars / year
6,223
homes / year
2,121,513
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The Kundah I-V hydro power plant, located in India, is a significant contributor to the country’s energy sector, with a total installed capacity of 555 megawatts (MW). Commissioned in 1966, this facility plays a crucial role in harnessing the hydropower potential of the region and is part of India’s broader efforts to diversify its energy portfolio and increase reliance on renewable energy sources. Situated in the picturesque Nilgiri district of Tamil Nadu, Kundah I-V utilizes the abundant water resources available in the area, making it a vital asset for both local and national energy supply.

As a hydroelectric power plant, Kundah I-V primarily generates electricity through the gravitational force of flowing water. The facility harnesses the kinetic energy of water flowing from higher elevations to lower ones, converting it into electrical energy through turbines. This process is efficient and produces minimal operational emissions, making hydropower one of the cleanest forms of energy generation. The use of hydraulic turbines allows the plant to convert the potential energy of stored water into mechanical energy, which is then transformed into electrical energy. This technology not only supports the generation of electricity but also aids in water management and flood control in the surrounding areas.

The environmental impact of the Kundah I-V hydro power plant is relatively low compared to fossil fuel-based energy generation. Hydropower plants like Kundah contribute to reducing greenhouse gas emissions, helping to combat climate change. However, the construction and operation of hydroelectric plants can also lead to ecological changes, such as habitat alteration and impacts on local aquatic ecosystems. It is essential to conduct thorough environmental assessments and implement mitigation strategies to minimize these effects, ensuring that the benefits of renewable energy do not come at the cost of local biodiversity.

Regionally, the Kundah I-V power plant serves as a backbone for energy supply in Tamil Nadu, a state known for its industrial and agricultural activities. The availability of reliable and renewable energy from this hydroelectric facility supports economic growth, enhances energy security, and contributes to the overall stability of the power grid. Moreover, the plant fosters local employment opportunities and promotes socio-economic development for communities in proximity to the facility. The success of Kundah I-V exemplifies the potential of hydropower in addressing the energy demands of India while contributing to sustainable development goals. Through its operational longevity and capacity, the Kundah I-V hydro power plant not only showcases the technological advancements in renewable energy but also highlights India’s commitment to transitioning toward a more sustainable energy future.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.