Norway

Langvatn — 115 MW Hydroelectric

Hydroelectric Renewable Verified

Langvatn is a 115 MW hydro power plant located in Norway. View location, capacity, and technical details.

Capacity
115 MW

Installed

Commissioned
1989

Year online

Owner
Statkraft

Operator

Location
66.34, 14.17

Coordinates

Insights

#96
largest in Norway
#2,128
largest Hydroelectric worldwide
#9,472
largest worldwide
1989
5 yrs newer than avg
264
operated by Statkraft
20
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
115 MW
Commissioned
1989
Status
Operational
Owner
Statkraft
Country
Norway
Coordinates
66.337, 14.167

Estimated Carbon Footprint

Annual CO₂
9,671 t

tonnes / year

Lifetime CO₂
773,683 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

2,102
cars / year
1,289
homes / year
439,593
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Langvatn is a 115 MW hydroelectric power plant located in Norway. It is one of the many facilities generating electricity from water resources in the country. The plant contributes to Norway’s extensive hydroelectric capacity.

Langvatn ranks as the 80th largest hydro plant in Norway. With its 115 MW capacity, it represents 0.34% of the country’s total hydro capacity of 33,795 MW. Norway has 376 hydro plants with a combined capacity exceeding 33,000 MW. Compared to the largest hydro plant in Norway, Kvilldal at 1,444 MW, Langvatn is approximately one-twelfth the size.

Hydropower is a dominant energy source in Norway, accounting for around 95% of the country’s electricity generation. The plant utilizes the abundant water resources available in the region, which is characterized by numerous rivers and lakes. Langvatn is situated in Northern Norway, approximately 1,000 km north of Oslo.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.