Mpanda Burundi is a 10 MW hydro power plant located in Burundi. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 10 MW
- Commissioned
- 2015
- Status
- Operational
- Owner
- Burundi Energy Company
- Country
- BDI
- Coordinates
- -3.083, 29.394
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
About this plant
Mpanda Burundi is a 10.4 MW hydro power plant in Burundi.
Ranked #3 of 3 hydro plants in Burundi. Its 10.4 MW represents 20.98% of Burundi’s total hydro capacity of 50 MW. The largest hydro plant in Burundi is Kabu at 20 MW, making Mpanda Burundi 1.9 times smaller.
Nearby plants within 50 km include Kabu (20 MW, Hydro) and Rwegura (19.17 MW, Hydro). The facility is located in the Gitega Province, approximately 50 km from the capital city, Gitega.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.