Germany

NECKARWESTHEIM-2 — 1,400 MW Nuclear

Nuclear Verified

NECKARWESTHEIM-2 is a 1,400 MW nuclear power plant located in Germany. View location, capacity, and technical details.

Capacity
1,400 MW

Installed

Commissioned
1989

Year online

Owner
EnBW Energie Baden-Württemberg AG

Operator

Location
49.04, 9.18

Coordinates

Insights

#28
largest in Germany
#263
largest Nuclear worldwide
#1,401
largest worldwide
1989
1 yrs newer than avg
83
operated by EnBW Energie Baden-Württemberg…
110
plants within 100 km

Technical Details

Fuel Type
Nuclear
Capacity
1,400 MW
Commissioned
1989
Status
Operational
Owner
EnBW Energie Baden-Württemberg AG
Country
Germany
Coordinates
49.041, 9.176

Carbon Footprint

Annual CO₂
125,093 t

tonnes / year

Lifetime CO₂
6,254,640 t

over ~50 yrs

Intensity
12 g

Est. gCO2/kWh

Annual emissions equivalent to

27,194
cars per year
16,679
homes per year
5,686,036
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Plants

About this plant

NECKARWESTHEIM-2 is a nuclear power plant located in Germany, with a capacity of 1,400 megawatts (MW). Commissioned in 1989, this facility plays a significant role in the country’s energy sector, particularly in its efforts to provide a stable and reliable electricity supply. As a pressurized water reactor (PWR), NECKARWESTHEIM-2 utilizes nuclear fuel, primarily uranium dioxide, which undergoes fission to generate heat. This heat is then used to produce steam that drives turbines, ultimately generating electricity. The reactor is designed to operate with enriched uranium fuel, typically enriched to about 3-5% U-235, which is sufficient for sustained nuclear reactions within the reactor core.

In the broader context of Germany’s energy landscape, NECKARWESTHEIM-2 contributes significantly to the nation’s electricity generation mix. As a nuclear facility, it provides a low-carbon source of energy, which is particularly important in light of Germany’s commitment to reducing greenhouse gas emissions and transitioning towards more sustainable energy sources. Despite the country’s ambitious Energiewende (energy transition) policy, which aims to phase out nuclear power in favor of renewable energy, NECKARWESTHEIM-2 continues to play a crucial role in ensuring energy security and reliability in the region.

The environmental impact of NECKARWESTHEIM-2 is a subject of ongoing debate. Nuclear power is often regarded as a cleaner alternative to fossil fuels because it produces minimal direct carbon emissions during operation. However, concerns remain regarding radioactive waste management, the potential for accidents, and the long-term sustainability of nuclear energy. The plant employs stringent safety protocols and regulatory measures to mitigate risks associated with nuclear power, aiming to ensure both operational safety and environmental protection.

Regionally, NECKARWESTHEIM-2 serves as a vital component of the local economy and energy infrastructure. It provides jobs, contributes to local economic activity, and supports ancillary industries related to nuclear energy. The plant is part of a larger network of energy producers in the region, helping to stabilize the grid and ensure that electricity demand is met, particularly during peak usage times. Additionally, NECKARWESTHEIM-2’s presence underscores the importance of nuclear energy in the transition towards a more balanced and diversified energy portfolio for Germany, even as the country explores pathways to increase reliance on renewable sources.

In conclusion, NECKARWESTHEIM-2 is a significant nuclear power plant in Germany that plays a crucial role in the nation’s energy sector. With its substantial capacity and technical capabilities, it contributes to the provision of reliable electricity while also presenting environmental considerations that continue to shape discussions around nuclear power’s future in Germany.

More Nuclear plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.