Spain

PALOS DE LA FRONTERA GRUPO 1 — 1,167 MW Natural Gas

Natural Gas Verified

PALOS DE LA FRONTERA GRUPO 1 is a 1,167 MW gas power plant located in Spain. View location, capacity, and technical details.

Capacity
1,167 MW

Installed

Commissioned
2004

Year online

Owner
GAS NATURAL FENOSA GENERACION S.L.U.

Operator

Location
37.18, -6.89

Coordinates

Insights

#18
largest in Spain
#573
largest Natural Gas worldwide
#2,122
largest worldwide
2004
5 yrs newer than avg
4
operated by GAS NATURAL FENOSA…
47
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
1,167 MW
Commissioned
2004
Status
Operational
Owner
GAS NATURAL FENOSA GENERACION S.L.U.
Country
Spain
Coordinates
37.184, -6.886

Carbon Footprint

Annual CO₂
2,254,154 t

tonnes / year

Lifetime CO₂
67,624,616 t

over ~30 yrs

Intensity
490 g

Est. gCO2/kWh

Annual emissions equivalent to

490,033
cars per year
300,554
homes per year
102,461,539
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Plants

About this plant

The Palos de la Frontera Grupo 1 power plant is a significant gas-fired facility located in Spain, with a total installed capacity of 1167 megawatts (MW). Commissioned in 2004, it is owned and operated by Gas Natural Fenosa Generación S.L.U., a major player in the Spanish energy sector. This power plant plays a crucial role in meeting the energy demands of Spain, particularly in regions where gas generation is a primary source of electricity. Its ability to generate substantial power contributes to the overall stability and reliability of the national grid, especially during peak demand periods.

Operating on natural gas, the Palos de la Frontera Grupo 1 power plant utilizes combined cycle technology, which enhances efficiency and reduces emissions compared to conventional fossil fuel power plants. Natural gas is favored in many modern power generation settings due to its relatively lower carbon footprint when burned, as well as its ability to provide flexible and responsive power production. In a combined cycle configuration, the plant generates electricity through gas turbines, and the waste heat from these turbines is captured and used to produce steam for a steam turbine, thereby maximizing energy output from the fuel consumed.

The environmental impact of the Palos de la Frontera power plant is significantly lower than that of older coal-fired plants, primarily due to the cleaner burning of natural gas. While the facility still produces greenhouse gas emissions, its operational design aims to mitigate environmental harm. Spain’s commitment to reducing carbon emissions aligns well with the operational profile of the Palos de la Frontera plant, as the country seeks to transition towards more sustainable energy sources. Nevertheless, the reliance on natural gas does pose challenges related to methane emissions during extraction and transportation, which are important considerations in the broader context of climate change.

Regionally, the Palos de la Frontera Grupo 1 power plant is strategically located to serve the southern regions of Spain, providing essential electricity supply to a growing population and supporting various industrial activities. Its proximity to key infrastructure such as gas pipelines enhances its operational efficiency and reliability. The plant is not only pivotal for local energy security but also contributes to Spain’s broader energy strategy, which emphasizes diversification of energy sources and a gradual shift towards renewable energy. As the country continues to invest in renewable technologies, natural gas plants like Palos de la Frontera will play an important transitional role, supporting grid stability while renewables are integrated into the energy mix.

More Natural Gas plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.