Pickwick Landing Dam is a 240 MW hydro power plant located in United States of America. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 240 MW
- Commissioned
- 1944
- Status
- Operational
- Owner
- Tennessee Valley Authority
- Country
- United States
- Coordinates
- 35.068, -88.249
Carbon Footprint
tonnes / year
over ~80 yrs
Est. gCO2/kWh
Annual emissions equivalent to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Plants
Browns Ferry
United States of America · Nuclear
Browns Ferry Nuclear Power Plant
United States of America · Nuclear
James H Miller Jr
United States of America · Coal
Cumberland (TN)
United States of America · Coal
Lagoon Creek
United States of America · Natural Gas
Johnsonville
United States of America · Natural Gas
About this plant
Ranked as the 1246th largest power generation facility in the United States, Pickwick Landing Dam holds a notable position in the energy landscape of the country, especially as the 88th largest hydro facility among 1469 such plants. With a capacity of 240 MW, this hydroelectric plant, operated by the Tennessee Valley Authority since its commissioning in 1944, contributes a modest 0.02% to the national capacity of 1,386,385 MW. The dam harnesses the flow of the Tennessee River, utilizing the principles of hydroelectric generation to convert the kinetic energy of flowing water into electricity, showcasing a reliable and renewable energy source. Located in a region with diverse energy assets, Pickwick Landing Dam is complemented by nearby facilities including the Colbert Gas Plant, which boasts a capacity of 476 MW, and the River Bend Solar LLC, with a capacity of 75 MW. This combination of gas, solar, and hydro reflects a growing trend towards diversified energy production in the area. The dam plays a crucial role in stabilizing the local grid, particularly as the dominant fuel in the U.S. remains natural gas. In terms of national energy strategy, the plant exemplifies the ongoing reliance on hydroelectric power, even as gas continues to lead in overall capacity. The Tennessee Valley Authority has been at the forefront of energy production since the mid-20th century, and Pickwick Landing Dam remains a vital part of their portfolio. As the energy sector evolves, the significance of such facilities cannot be understated; they not only provide essential renewable energy but also help mitigate carbon emissions, contributing to a more sustainable future. The enduring legacy of Pickwick Landing Dam serves as a reminder of the balance between historical infrastructure and modern energy demands.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.