MNE

Piva (Mratinje) Hydroelectric Power Plant Montenegro — 360 MW Hydroelectric

Hydroelectric Renewable Verified

Piva (Mratinje) Hydroelectric Power Plant Montenegro is a 360 MW hydro power plant located in Montenegro. View location, capacity, and technical details.

Capacity
360 MW

Installed

Commissioned
1970

Year online

Owner
Electricity Company of Montenegro

Operator

Location
43.27, 18.84

Coordinates

Insights

#1
largest in %s
#952
largest %s worldwide
#5,549
largest worldwide
1970
%d yrs older than avg
1
operated by %s
10
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
360 MW
Commissioned
1970
Status
Operational
Owner
Electricity Company of Montenegro
Country
MNE
Coordinates
43.273, 18.842

Estimated Carbon Footprint

Annual CO₂
30,275 t

tonnes / year

Lifetime CO₂
2.4M t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

6,581
cars / year
4,037
homes / year
1.4M
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Piva (Mratinje) Hydroelectric Power Plant represents a vital asset in Montenegro’s energy generation framework, contributing a notable 360 MW of capacity to the national grid. Situated at coordinates 43.2725, 18.8422, this hydroelectric facility harnesses the power of flowing water, utilizing advanced hydroelectric generation technology to produce clean and renewable energy. Hydropower is a cornerstone of Montenegro’s energy strategy, with the country aiming to develop its rich water resources to ensure energy security and reduce reliance on fossil fuels. The Piva plant plays a key role in balancing the energy supply, especially during peak demand periods, thanks to its ability to generate electricity efficiently. This facility is crucial not only for meeting the local energy needs but also for supporting the regional power market. Montenegro’s energy policies are increasingly focused on sustainability, and plants like Piva (Mratinje) are essential in achieving national targets for renewable energy production. The operational excellence of the plant ensures that it remains a reliable source of power. Additionally, its location in a region abundant with natural water resources enhances its efficiency and sustainability profile. By leveraging hydroelectric technology, the Piva plant exemplifies Montenegro’s commitment to clean energy, contributing significantly to the country’s efforts to transition towards a more sustainable energy future.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.