PLTU Jawa Tengah 1 – Rembang — 630 MW Coal

Coal Verified

PLTU Jawa Tengah 1 – Rembang is a 630 MW coal power plant located in Indonesia. View location, capacity, and technical details.

Capacity
630 MW

Installed

Commissioned
2016

Year online

Owner
PLN(EPC : Zeland-Priamanaya-Tronoh)

Operator

Location
-6.64, 111.47

Coordinates

Insights

#47
largest in Indonesia
#1,310
largest Coal worldwide
#3,848
largest worldwide
2016
19 yrs newer than avg
1
operated by PLN(EPC : Zeland-Priamanaya-Tronoh)
7
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
630 MW
Commissioned
2016
Status
Operational
Owner
PLN(EPC : Zeland-Priamanaya-Tronoh)
Country
Indonesia
Coordinates
-6.636, 111.475

Carbon Footprint

Annual CO₂
2,488,979 t

tonnes / year

Lifetime CO₂
99,559,152 t

over ~40 yrs

Intensity
820 g

Est. gCO2/kWh

Annual emissions equivalent to

541,082
cars per year
331,864
homes per year
113,135,400
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Plants

About this plant

PLTU Jawa Tengah 1 – Rembang is a significant coal-fired power plant located in Central Java, Indonesia, with a total installed capacity of 630 megawatts (MW). Owned by Perusahaan Listrik Negara (PLN), Indonesia’s state-owned electricity company, the plant is part of a broader effort to enhance the country’s energy security and support its growing electricity demand. The engineering, procurement, and construction (EPC) of the facility was managed by a consortium comprising Zeland, Priamanaya, and Tronoh, demonstrating a collaborative approach to energy infrastructure development in Indonesia.

The power plant primarily utilizes coal as its fuel source, which is a common choice for electricity generation in Indonesia due to the country’s abundant coal reserves. The use of coal as a fuel type presents both advantages and challenges. On one hand, coal-fired power plants like PLTU Jawa Tengah 1 can generate electricity at a relatively low cost, contributing to the stability and reliability of the national electricity supply. On the other hand, coal combustion is associated with significant environmental concerns, including greenhouse gas emissions and air pollution. The Indonesian government has been under pressure to transition towards cleaner energy sources, yet coal remains a cornerstone of the energy mix due to its economic viability and the existing infrastructure.

In terms of environmental impact, PLTU Jawa Tengah 1 is designed to incorporate various technologies aimed at minimizing its ecological footprint. This includes measures to reduce emissions of sulfur dioxide (SO2), nitrogen oxides (NOx), and particulate matter, which are common pollutants from coal combustion. The plant’s operational protocols are aligned with national and international environmental standards, reflecting an effort to balance energy production with environmental stewardship. Nonetheless, the reliance on coal continues to pose challenges regarding air quality and carbon emissions, necessitating ongoing discussions about transitioning to more sustainable energy sources in the future.

Regionally, PLTU Jawa Tengah 1 plays a crucial role in meeting the electricity needs of Central Java and beyond. The plant not only provides a reliable power supply to local industries and residential areas but also supports economic growth in the region. As Indonesia continues to develop its infrastructure and industrial base, power plants like PLTU Jawa Tengah 1 are essential for sustaining economic activities and enhancing the quality of life for its citizens. The project aligns with Indonesia’s national energy policy, which aims to ensure energy availability and affordability while gradually integrating renewable energy sources into the energy mix. Overall, PLTU Jawa Tengah 1 – Rembang stands as a pivotal component of Indonesia’s energy landscape, reflecting both the challenges and opportunities of coal-based power generation in a rapidly evolving energy sector.