PLTU Paiton I Unit 7 & 8 — 5,355 MW Coal

Coal Verified

PLTU Paiton I Unit 7 & 8 is a 5,355 MW coal power plant located in Indonesia. View location, capacity, and technical details.

Capacity
5,355 MW

Installed

Commissioned
2000

Year online

Owner
PT. Paiton Energy Corp

Operator

Location
-7.72, 113.58

Coordinates

Insights

#1
largest in %s
#7
largest %s worldwide
#68
largest worldwide
2000
%d yrs newer than avg
1
operated by %s
8
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
5,355 MW
Commissioned
2000
Status
Operational
Owner
PT. Paiton Energy Corp
Country
Indonesia
Coordinates
-7.718, 113.583

Estimated Carbon Footprint

Annual CO₂
21.2M t

tonnes / year

Lifetime CO₂
846.3M t

over ~%d yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

4.6M
cars / year
2.8M
homes / year
961.7M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

PLTU Paiton I Unit 7 & 8 is a significant coal-fired power plant located in Paiton, East Java, Indonesia, with a total capacity of 5,355 megawatts (MW). Owned by PT. Paiton Energy Corp., this facility plays a crucial role in Indonesia’s energy sector, contributing substantially to the country’s electricity supply. As one of the largest coal power plants in Indonesia, it is a key component of the national grid, helping to meet the growing demand for energy in a rapidly developing economy.

The plant operates primarily on coal, a fossil fuel that has been a staple energy source for many countries, including Indonesia. The choice of coal as a fuel type is significant due to its abundance in the region and relatively low cost compared to other energy sources. However, coal combustion is also associated with environmental concerns. The burning of coal emits greenhouse gases, particularly carbon dioxide (CO2), which contribute to climate change. Additionally, it releases other pollutants such as sulfur dioxide (SO2), nitrogen oxides (NOx), and particulate matter, which can have detrimental effects on air quality and public health. To mitigate these impacts, the plant is subject to environmental regulations that aim to limit emissions and promote cleaner energy practices.

In the context of Indonesia’s energy landscape, PLTU Paiton I Unit 7 & 8 is integral to the country’s energy security and economic development. Indonesia faces the challenge of balancing its energy needs with environmental responsibility. As the country seeks to increase its electrification rates, especially in rural areas, thermal power plants like Paiton I play a pivotal role in ensuring a stable and reliable supply of electricity. This is particularly important in a country where a significant portion of the population still lacks access to adequate power.

Moreover, the plant’s location in East Java enhances its regional significance. East Java is one of Indonesia’s most industrialized provinces, with a high demand for electricity from various sectors, including manufacturing, mining, and services. PLTU Paiton I Unit 7 & 8 not only serves the local grid but also contributes to the overall supply to other regions, thus facilitating economic growth and development.

In conclusion, PLTU Paiton I Unit 7 & 8 stands as a cornerstone of Indonesia’s energy infrastructure, reflecting both the opportunities and challenges of utilizing coal as a primary energy source. Its role in providing electricity is critical for supporting the country’s development goals while navigating the environmental implications associated with coal-fired power generation.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.