Russia

Primorskaya TPP — 1,467 MW Coal

Coal Verified

Primorskaya TPP is a 1,467 MW coal power plant located in Russia. View location, capacity, and technical details.

Capacity
1,467 MW

Installed

Commissioned
1974

Year online

Owner
JSC "FAR EASTERN GK" (JSC "DGK")

Operator

Location
46.46, 134.29

Coordinates

Insights

#59
largest in Russia
#491
largest Coal worldwide
#1,320
largest worldwide
1974
23 yrs older than avg
14
operated by JSC "FAR EASTERN…
0
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
1,467 MW
Commissioned
1974
Status
Operational
Owner
JSC "FAR EASTERN GK" (JSC "DGK")
Country
Russia
Coordinates
46.463, 134.291

Estimated Carbon Footprint

Annual CO₂
5,795,765 t

tonnes / year

Lifetime CO₂
231,830,597 t

over ~40 yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

1,259,949
cars / year
772,769
homes / year
263,443,860
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

About this plant

The Primorskaya Thermal Power Plant (TPP), with a capacity of 1467 megawatts (MW), is a significant coal-fired power facility located in Russia’s Primorsky Krai region. Owned by JSC ‘FAR EASTERN GK’ (JSC ‘DGK’), the plant was commissioned in 1974 and has played a crucial role in the energy sector of the Far East region of Russia. This power plant is instrumental in providing electricity and thermal energy to both residential and industrial consumers, contributing to the overall energy stability and economic development of the area.

Primorskaya TPP operates primarily on coal, a fuel type that has historically been a dominant energy source in Russia due to its abundant domestic reserves. The plant utilizes pulverized coal combustion technology, which allows for efficient burning of the coal and maximizes energy output. Coal, while providing a reliable means of energy generation, poses various technical challenges, including the need for effective emissions control systems to minimize pollutants released into the atmosphere. The use of coal also necessitates a robust supply chain for its transport and storage, given the logistical considerations involved in moving such large quantities of fuel.

From an environmental perspective, the Primorskaya TPP faces scrutiny due to the inherent emissions associated with coal combustion. These include carbon dioxide (CO2), sulfur dioxide (SO2), and particulate matter, which contribute to air pollution and climate change. The Russian government, alongside regional authorities, has been increasingly focused on reducing greenhouse gas emissions and transitioning toward cleaner energy sources. However, the reliance on coal remains significant in many areas, particularly where alternatives are not yet fully developed or economically viable. As such, the plant’s operations are often balanced against the need for environmental sustainability and compliance with evolving regulations.

Regionally, the Primorskaya TPP is vital for the energy infrastructure of Primorsky Krai, supporting both urban centers and rural communities. It ensures a stable power supply that is essential for economic activities, including mining, manufacturing, and agriculture. The plant also plays a role in regional energy security, providing a buffer against potential energy shortages that could arise from fluctuations in other energy sources. As a key component of the Far Eastern energy grid, its operational reliability is critical for maintaining the overall stability of the region’s electricity supply.

In summary, the Primorskaya TPP is an important coal-fired power plant in Russia, contributing significantly to the region’s energy needs since its commissioning in 1974. While it provides essential power generation, the environmental implications of coal use continue to present challenges that the energy sector must address as it evolves towards more sustainable practices.

More Coal plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.