Russia

Raichihinskaya GRES — 102 MW Coal

Coal Verified

Raichihinskaya GRES is a 102 MW coal power plant located in Russia. View location, capacity, and technical details.

Capacity
102 MW

Installed

Commissioned
1965

Year online

Owner
JSC "FAR EASTERN GK" (JSC "DGK")

Operator

Location
49.75, 129.69

Coordinates

Insights

#341
largest in %s
#2,364
largest %s worldwide
#9,910
largest worldwide
1965
%d yrs older than avg
14
operated by %s
2
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
102 MW
Commissioned
1965
Status
Operational
Owner
JSC "FAR EASTERN GK" (JSC "DGK")
Country
Russia
Coordinates
49.748, 129.692

Estimated Carbon Footprint

Annual CO₂
402,978 t

tonnes / year

Lifetime CO₂
16,119,101 t

over ~%d yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

87,604
cars / year
53,730
homes / year
18,317,160
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

Raichihinskaya GRES is a 102 MW coal-fired power plant located in Russia, operated by JSC “FAR EASTERN GK” (JSC “DGK”). The facility generates electricity using coal, contributing to Russia’s thermal power generation capacity.

It is the 86th largest coal plant in Russia. With a capacity of 102 MW, it represents 0.18% of Russia’s total coal capacity of 56,758 MW. Russia has 112 coal plants with a combined capacity of 56,758 MW. Compared to the largest coal plant in Russia, Reftinskaya GRES at 3,800 MW, Raichihinskaya GRES is approximately one-thirty-seventh the size.

Coal remains a major energy source in Russia, providing about 18% of the country’s electricity generation. The Raichihinskaya GRES plant uses locally sourced coal, which is a critical component of the energy strategy in the Far East region. It is situated approximately 200 km from the city of Khabarovsk in the Russian Far East.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.