Saudi Arabia

Riyadh 5 — 608 MW Oil

Oil Verified

Riyadh 5 is a 608 MW oil power plant located in Saudi Arabia. View location, capacity, and technical details.

Capacity
608 MW

Installed

Commissioned
1982

Year online

Owner
Saudi Electricity Company (SEC)

Operator

Location
24.76, 46.59

Coordinates

Insights

#65
largest in Saudi Arabia
#143
largest Oil worldwide
#3,964
largest worldwide
1982
15 yrs older than avg
53
operated by Saudi Electricity Company…
17
plants within 100 km

Technical Details

Fuel Type
Oil
Capacity
608 MW
Commissioned
1982
Status
Operational
Owner
Saudi Electricity Company (SEC)
Country
Saudi Arabia
Coordinates
24.760, 46.592

Estimated Carbon Footprint

Annual CO₂
1,384,781 t

tonnes / year

Lifetime CO₂
41,543,424 t

over ~30 yrs

Intensity
650 g

gCO₂ per kWh

Annual emissions equal to

301,039
cars / year
184,637
homes / year
62,944,582
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Riyadh 5 power plant, with a capacity of 608 megawatts (MW), is a significant facility in Saudi Arabia’s energy sector. Commissioned in 1982, it is owned and operated by the Saudi Electricity Company (SEC), which is the primary provider of electricity in the kingdom. The plant plays a crucial role in meeting the growing demand for electricity in Riyadh and surrounding regions, providing a reliable source of energy that supports residential, commercial, and industrial needs. As one of the key power generation facilities in the country, Riyadh 5 contributes to the overall stability and reliability of the national grid.

The power plant is fueled by oil, a primary energy source in Saudi Arabia, which has one of the largest reserves of crude oil in the world. Oil-fired power plants like Riyadh 5 utilize the combustion of fuel oil to generate electricity. This process involves burning oil to produce steam, which drives turbines connected to generators. While oil remains a vital energy source for Saudi Arabia, reliance on this fuel type raises concerns regarding sustainability and environmental impact, particularly in terms of greenhouse gas emissions and air quality.

The environmental impact of oil-fired power plants can be significant, as burning fossil fuels releases carbon dioxide (CO2) and other pollutants into the atmosphere. While technological advancements have improved efficiency and reduced emissions in modern oil plants, the Riyadh 5 facility, commissioned in the early 1980s, may not incorporate the latest environmental protections. As Saudi Arabia shifts its focus toward more sustainable energy solutions, including renewable energy, the role of oil in the energy mix is being reassessed, leading to discussions about the future of facilities like Riyadh 5.

Regionally, the Riyadh 5 power plant is of strategic importance. It not only supports the capital city of Riyadh but also contributes to the broader energy needs of central Saudi Arabia. The facility’s output plays a vital role in ensuring that the growing population and expanding industries in the region have access to reliable electricity. As the kingdom aims to diversify its energy sources and reduce its dependence on fossil fuels, the Riyadh 5 plant stands as a landmark of the past energy landscape while also representing the challenges and transitions facing the Saudi energy sector in the coming years.

In conclusion, the Riyadh 5 power plant is a cornerstone of the Saudi electricity infrastructure, reflecting both the historical reliance on oil as a fuel source and the ongoing challenges associated with environmental sustainability and energy diversification. As Saudi Arabia continues to develop its Vision 2030 plan, which emphasizes a shift toward renewable energy, the future operational status of Riyadh 5 will likely evolve in response to national energy policies and global trends.

More Oil plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.