Spain

San Esteban II Grupo 1 — 438 MW Hydroelectric

Hydroelectric Renewable Verified

San Esteban II Grupo 1 is a 438 MW hydro power plant located in Spain. View location, capacity, and technical details.

Capacity
438 MW

Installed

Commissioned
2012

Year online

Owner
IBERDROLA GENERACION S.A.

Operator

Location
42.41, -7.65

Coordinates

Insights

#88
largest in Spain
#818
largest Hydroelectric worldwide
#5,029
largest worldwide
2012
28 yrs newer than avg
32
operated by IBERDROLA GENERACION S.A.
121
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
438 MW
Commissioned
2012
Status
Operational
Owner
IBERDROLA GENERACION S.A.
Country
Spain
Coordinates
42.414, -7.653

Estimated Carbon Footprint

Annual CO₂
36,872 t

tonnes / year

Lifetime CO₂
2,949,751 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

8,016
cars / year
4,916
homes / year
1,675,995
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The San Esteban II power plant, owned by IBERDROLA GENERACION S.A., is a significant hydroelectric facility located in Spain, with a total capacity of 438.45 megawatts (MW). Commissioned in 2012, this plant plays a crucial role in Spain’s energy sector, contributing to the country’s efforts to transition towards renewable energy sources and reduce carbon emissions. As a hydroelectric facility, San Esteban II harnesses the kinetic energy of flowing water to generate electricity, making it a vital component of Spain’s renewable energy portfolio.

Hydroelectric power is generated by capturing the energy of water as it flows from higher elevations to lower ones, typically through a dam or a series of turbines. The San Esteban II plant utilizes this principle, converting the gravitational potential energy of water into mechanical energy, which is then transformed into electrical energy by generators. The plant’s operational efficiency is enhanced by its modern design and technology, which allows for optimized water flow management and energy production, ensuring a reliable supply of electricity to the grid.

In terms of environmental impact, San Esteban II represents a cleaner alternative to fossil fuel-based power generation. By relying on hydroelectric power, the plant helps to significantly reduce greenhouse gas emissions and air pollutants associated with traditional energy sources. Additionally, hydroelectric facilities like San Esteban II often contribute to water management and irrigation systems, providing ancillary benefits to local communities. However, it is important to acknowledge that the construction and operation of hydroelectric plants can also impact local ecosystems and aquatic life, necessitating careful environmental assessments and mitigation strategies to minimize negative effects.

Regionally, the San Esteban II power plant holds significant importance. It not only supports the local economy through job creation and infrastructure development but also contributes to the stability of the national grid. As Spain continues to pursue its ambitious renewable energy goals, facilities like San Esteban II are pivotal in achieving a balance between energy demand and sustainable practices. Moreover, the plant serves as a testament to IBERDROLA’s commitment to renewable energy, showcasing advancements in technology and a forward-thinking approach to energy production.

In summary, the San Esteban II power plant is a cornerstone of Spain’s renewable energy strategy. Its hydroelectric capacity not only aids in reducing carbon emissions and promoting environmental sustainability but also enhances energy security for the region. As the country moves toward a more sustainable energy future, the role of hydroelectric facilities like San Esteban II will become increasingly crucial in meeting energy needs while addressing environmental concerns.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.