India

SEIONI TPP — 600 MW Coal

Coal Verified

SEIONI TPP is a 600 MW coal power plant located in India. View location, capacity, and technical details.

Capacity
600 MW

Installed

Commissioned
2016

Year online

Owner
Madhya Pradesh Power Generating Company

Operator

Location
22.74, 79.91

Coordinates

Insights

#256
largest in India
#1,357
largest Coal worldwide
#3,989
largest worldwide
2016
19 yrs newer than avg
15
operated by Madhya Pradesh Power…
3
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
600 MW
Commissioned
2016
Status
Operational
Owner
Madhya Pradesh Power Generating Company
Country
India
Coordinates
22.736, 79.912

Estimated Carbon Footprint

Annual CO₂
2,370,456 t

tonnes / year

Lifetime CO₂
94,818,240 t

over ~40 yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

515,317
cars / year
316,061
homes / year
107,748,000
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The SEIONI Thermal Power Plant (TPP) is a notable coal-fired power generation facility located in India, with a total installed capacity of 600 megawatts (MW). Commissioned in 2016, SEIONI TPP plays a crucial role in the country’s energy sector, contributing significantly to the national grid and helping to meet the increasing electricity demand in a rapidly developing economy. As coal remains one of the primary sources of energy in India, this power plant exemplifies the ongoing reliance on fossil fuels as the country strives to balance economic growth with energy security.

The SEIONI TPP utilizes coal as its primary fuel source, which is abundant in India. Coal-fired power plants like SEIONI are designed to convert the thermal energy produced from burning coal into electrical energy through a series of processes involving steam generation, turbine operation, and electricity generation. The use of coal in power generation is characterized by its high energy density and relatively low cost compared to other fuel sources. However, the combustion of coal also results in the emission of greenhouse gases, primarily carbon dioxide (CO2), along with other pollutants such as sulfur dioxide (SO2) and nitrogen oxides (NOx), which have implications for air quality and climate change.

The environmental impact of the SEIONI TPP is a matter of considerable discussion. While the plant supports India’s energy needs, its reliance on coal raises concerns regarding air pollution and carbon emissions. In response to these challenges, the Indian government has implemented regulations aimed at reducing emissions from coal-fired power plants, including the installation of flue gas desulfurization (FGD) systems and particulate matter control technologies. The energy sector in India is increasingly focused on integrating cleaner technologies and transitioning towards renewable energy sources, but coal remains a vital part of the current energy mix, especially in regions where alternative sources are not yet fully developed.

Regionally, the SEIONI TPP serves as a critical asset for local and national energy infrastructure, providing electricity to nearby industries and residential areas. Its operational capacity contributes to the stability of the power supply in the region, particularly in times of peak demand. Furthermore, the plant generates employment opportunities and stimulates economic activity in the surrounding areas, although it also faces scrutiny from environmental groups advocating for a shift towards sustainable energy practices.

In summary, the SEIONI TPP is an integral component of India’s coal-based energy landscape, reflecting the complexities of balancing energy needs with environmental considerations. As India continues to navigate its energy transition, the role of plants like SEIONI will remain significant in the short term while the country aims to diversify its energy portfolio toward more sustainable sources in the long run.