Saudi Arabia

SHUAIBA (SWCC) — 911 MW Oil

Oil Verified

SHUAIBA (SWCC) is a 911 MW oil power plant located in Saudi Arabia. View location, capacity, and technical details.

Capacity
911 MW

Installed

Commissioned
2000

Year online

Owner
Saline Water Conversion Corporation (SWCC)

Operator

Location
17.66, 42.06

Coordinates

Insights

#51
largest in Saudi Arabia
#85
largest Oil worldwide
#2,671
largest worldwide
2000
3 yrs newer than avg
6
operated by Saline Water Conversion…
8
plants within 100 km

Technical Details

Fuel Type
Oil
Capacity
911 MW
Commissioned
2000
Status
Operational
Owner
Saline Water Conversion Corporation (SWCC)
Country
Saudi Arabia
Coordinates
17.660, 42.063

Carbon Footprint

Annual CO₂
2,074,438 t

tonnes / year

Lifetime CO₂
62,233,142 t

over ~30 yrs

Intensity
650 g

Est. gCO2/kWh

Annual emissions equivalent to

450,965
cars per year
276,592
homes per year
94,292,640
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Plants

About this plant

The SHUAIBA Power Plant, operated by the Saline Water Conversion Corporation (SWCC), is a significant energy facility located in Saudi Arabia. Commissioned in the year 2000, this power plant boasts a capacity of approximately 910.8 megawatts (MW) and primarily utilizes oil as its fuel source. The plant plays a crucial role in the kingdom’s energy sector, contributing to both electricity generation and water desalination, which are vital for supporting the growing demands of the country’s population and industrial activities.

As an oil-fueled power plant, SHUAIBA employs a combustion process where the energy released from burning oil is converted into electrical power. Oil remains a dominant fuel choice in Saudi Arabia due to the country’s vast reserves, although there is a global shift towards more sustainable energy sources. The plant’s reliance on oil ensures a continuous supply of energy, particularly in a region where renewable energy sources are still developing. However, this reliance also raises environmental concerns, particularly in terms of greenhouse gas emissions and air quality, as the combustion of oil is associated with the release of carbon dioxide and other pollutants.

The environmental impact of the SHUAIBA Power Plant is a point of discussion among policymakers and environmental advocates. While oil is a readily available resource in Saudi Arabia, its combustion contributes to climate change and local air quality issues. The SWCC has been exploring ways to mitigate these impacts, including potential upgrades to emissions control technologies and efforts to enhance energy efficiency within the plant’s operations. Furthermore, the plant’s integrated approach to energy and water production aligns with the country’s goals of ensuring water security while meeting energy demands.

Regionally, the SHUAIBA Power Plant is significant not only for its energy output but also for its role in supporting the water desalination process. In a country where freshwater resources are scarce, the plant’s capacity to produce potable water through desalination is crucial. This dual function of generating electricity and providing freshwater underlines the importance of the plant in Saudi Arabia’s infrastructure and economic development. As the country continues to diversify its energy portfolio and increase its focus on renewable energy, the SHUAIBA facility stands as a key player in transitioning toward a more sustainable energy future while addressing immediate needs for power and water.

Overall, the SHUAIBA Power Plant exemplifies the complexities and challenges of balancing energy production, environmental sustainability, and resource management in a region heavily reliant on fossil fuels. As Saudi Arabia navigates its energy transition, the legacy and operational strategies of facilities like SHUAIBA will be central to shaping the future of its energy landscape.

More Oil plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.