United Arab Emirates

Shuweihat S3 Power Plant — 1,600 MW Natural Gas

Natural Gas Verified

Shuweihat S3 Power Plant is a 1,600 MW gas power plant located in United Arab Emirates. View location, capacity, and technical details.

Capacity
1,600 MW

Installed

Commissioned
2018

Year online

Owner
Shuweihat Asia Power Company

Operator

Location
24.15, 52.57

Coordinates

Insights

#21
largest in United Arab Emirates
#261
largest Natural Gas worldwide
#1,151
largest worldwide
2018
19 yrs newer than avg
1
operated by Shuweihat Asia Power…
11
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
1,600 MW
Commissioned
2018
Status
Operational
Owner
Shuweihat Asia Power Company
Country
United Arab Emirates
Coordinates
24.154, 52.567

Estimated Carbon Footprint

Annual CO₂
3,090,528 t

tonnes / year

Lifetime CO₂
92,715,840 t

over ~30 yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

671,854
cars / year
412,070
homes / year
140,478,545
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Shuweihat S3 Power Plant is a significant energy facility located in the United Arab Emirates (UAE) with a total capacity of 1600 megawatts (MW). Owned by the Shuweihat Asia Power Company, this gas-fired power plant plays a crucial role in the UAE’s energy sector, contributing to the country’s growing demand for electricity while supporting its economic development and sustainability goals. The power plant utilizes natural gas as its primary fuel, which is known for being one of the cleaner fossil fuels. Natural gas combustion emits lower levels of carbon dioxide, sulfur dioxide, and particulate matter compared to coal or oil, making it a more environmentally friendly option for power generation. This characteristic aligns with the UAE’s commitment to reducing greenhouse gas emissions and investing in cleaner energy technologies as part of its broader strategy for sustainable development.

Technically, the Shuweihat S3 Power Plant employs advanced combined cycle technology. This process involves using the hot gases produced from gas turbines to drive a steam turbine, thereby maximizing energy efficiency. The combined cycle system not only enhances the overall efficiency of the plant but also minimizes fuel consumption and emissions. Given the increasing reliance on natural gas in the UAE’s energy mix, the Shuweihat S3 Power Plant is well-positioned to meet the country’s electricity needs, especially during peak demand periods.

In terms of environmental impact, the Shuweihat S3 Power Plant is designed to adhere to stringent emissions standards set by both local and international regulatory bodies. The plant incorporates various technologies aimed at mitigating its ecological footprint, such as low-NOx burners and advanced monitoring systems. By optimizing fuel efficiency and reducing harmful emissions, the Shuweihat S3 Power Plant contributes positively to the UAE’s environmental objectives.

The regional significance of the Shuweihat S3 Power Plant extends beyond its immediate contributions to power generation. It is part of a broader initiative to enhance energy security in the UAE and the Gulf Cooperation Council (GCC) region. With the demand for electricity continuously rising due to population growth and industrial expansion, the Shuweihat S3 Power Plant is essential in ensuring a reliable and stable energy supply. Furthermore, the facility supports the UAE’s economic diversification efforts by enabling the growth of various sectors, including industry, tourism, and infrastructure development.

In conclusion, the Shuweihat S3 Power Plant serves as a vital asset in the UAE’s energy landscape, leveraging natural gas to produce electricity efficiently and sustainably. Its advanced technology and commitment to environmental responsibility underscore its role in fostering a resilient energy future for the country and the region.

More Natural Gas plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.