Canada

Sir Adam Beck Pump — 174 MW Hydroelectric

Hydroelectric Renewable Verified

Sir Adam Beck Pump is a 174 MW hydro power plant located in Canada. View location, capacity, and technical details.

Capacity
174 MW

Installed

Commissioned
1920

Year online

Owner
Ontario Power Generation

Operator

Location
43.14, -79.06

Coordinates

Insights

#192
largest in Canada
#1,625
largest Hydroelectric worldwide
#7,917
largest worldwide
1920
64 yrs older than avg
45
operated by Ontario Power Generation
90
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
174 MW
Commissioned
1920
Status
Operational
Owner
Ontario Power Generation
Country
Canada
Coordinates
43.145, -79.060

Carbon Footprint

Annual CO₂
14,633 t

tonnes / year

Lifetime CO₂
1,170,616 t

over ~80 yrs

Intensity
24 g

Est. gCO2/kWh

Annual emissions equivalent to

3,181
cars per year
1,951
homes per year
665,123
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Plants

About this plant

Sir Adam Beck Pump represents a crucial part of Canada’s hydroelectric power generation, ranking #192 among 1334 power plants nationwide. With a capacity of 174 MW, it holds the position of the 110th largest hydro facility out of 612 in Canada, symbolizing a small yet vital component of the country’s extensive hydroelectric network, which accounts for a significant portion of its energy supply. This plant contributes approximately 0.09% to Canada’s total capacity of 193,190 MW, a reflection of the nation’s overwhelming reliance on hydroelectricity as its dominant fuel source. Situated near Niagara Falls, Sir Adam Beck Pump utilizes the gravitational force of water to drive turbines, a renewable and efficient energy generation technology that harnesses one of Canada’s most abundant natural resources. The plant’s neighbors include the formidable Robert Moses Niagara, which boasts an impressive 2429 MW capacity, and several other hydro facilities like Sir Adam Beck 2 and Thorold CGS, highlighting a robust hydro cluster that significantly influences the regional grid. The collective capabilities of these plants underscore the region’s strength in hydroelectric power, contrasting with the national average capacity of about 144 MW per plant, where Sir Adam Beck Pump stands as a moderate contributor to the overall energy landscape. Owned and operated by Hydro One, the facility has been a reliable power source since its commissioning. As Canada continues to prioritize renewable energy and reduce greenhouse gas emissions, Sir Adam Beck Pump’s role will likely evolve, aligning with national goals for sustainability while ensuring that the energy needs of local communities are met.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.