India

S.SAROVAR RBPH — 1,200 MW Hydroelectric

Hydroelectric Renewable Verified

S.SAROVAR RBPH is a 1,200 MW hydro power plant located in India. View location, capacity, and technical details.

Capacity
1,200 MW

Installed

Commissioned
2005

Year online

Owner
Gujarat State Electricity Corporation Limited

Operator

Location
21.83, 73.75

Coordinates

Insights

#131
largest in India
#241
largest Hydroelectric worldwide
#1,870
largest worldwide
2005
21 yrs newer than avg
28
operated by Gujarat State Electricity…
32
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
1,200 MW
Commissioned
2005
Status
Operational
Owner
Gujarat State Electricity Corporation Limited
Country
India
Coordinates
21.830, 73.750

Estimated Carbon Footprint

Annual CO₂
100,915 t

tonnes / year

Lifetime CO₂
8,073,216 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

21,938
cars / year
13,455
homes / year
4,587,055
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The S.SAROVAR RBPH (Sardar Sarovar Reservoir Based Power House) is a significant hydroelectric power plant located in India, with a total installed capacity of 1200 MW. Commissioned in 2005, this facility plays a crucial role in the country’s energy sector, contributing to the growing demand for renewable energy sources and aiding in the reduction of reliance on fossil fuels. As a hydroelectric power plant, S.SAROVAR RBPH harnesses the kinetic energy of flowing water to generate electricity, making it a clean and sustainable option for energy production. The plant operates by utilizing the water stored in the Sardar Sarovar Dam, which is strategically positioned on the Narmada River in the state of Gujarat. The water released from the reservoir drives turbines, turning mechanical energy into electrical energy, which is then fed into the national grid.

The technical details of the S.SAROVAR RBPH highlight its efficiency and effectiveness as a hydroelectric facility. The plant features several units, each designed to optimize the conversion of hydraulic energy. The use of advanced turbine technology enables the plant to operate at varying water levels, ensuring consistent power generation even during periods of low water availability. Furthermore, hydroelectric power generation is characterized by its rapid response to fluctuations in energy demand, allowing the plant to stabilize the grid and provide ancillary services. This capability is particularly valuable in a country like India, where energy demand can be unpredictable.

In terms of environmental impact, hydroelectric power plants like S.SAROVAR RBPH are often viewed favorably compared to conventional fossil fuel plants. They produce no direct emissions of greenhouse gases during operation, contributing to cleaner air quality and reduced carbon footprints. However, it is important to note that the construction of large dams and associated infrastructure can lead to ecological changes, including habitat disruption and alterations in river ecosystems. In the case of S.SAROVAR, extensive environmental management programs have been implemented to mitigate potential negative impacts, promoting biodiversity conservation and sustainable land use practices in the surrounding areas.

Regionally, the S.SAROVAR RBPH is of paramount importance. It not only supplies electricity to millions of residents but also supports industrial growth and agricultural activities in Gujarat and neighboring states. The availability of reliable hydroelectric power facilitates economic development, enhances quality of life, and supports initiatives aimed at improving energy access for underprivileged communities. As India continues to pursue its renewable energy goals, the S.SAROVAR RBPH stands as a testament to the country’s commitment to harnessing its natural resources responsibly and sustainably.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.