Malaysia

Tanjung Kidurong Combined Cycle Plant — 1,324 MW Natural Gas

Natural Gas Verified

Tanjung Kidurong Combined Cycle Plant is a 1,324 MW gas power plant located in Malaysia. View location, capacity, and technical details.

Capacity
1,324 MW

Installed

Commissioned
2015

Year online

Owner
Sarawak Energy

Operator

Location
3.29, 113.09

Coordinates

Insights

#20
largest in Malaysia
#431
largest Natural Gas worldwide
#1,531
largest worldwide
2015
16 yrs newer than avg
25
operated by Sarawak Energy
6
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
1,324 MW
Commissioned
2015
Status
Operational
Owner
Sarawak Energy
Country
Malaysia
Coordinates
3.291, 113.093

Carbon Footprint

Annual CO₂
2,557,412 t

tonnes / year

Lifetime CO₂
76,722,358 t

over ~30 yrs

Intensity
490 g

Est. gCO2/kWh

Annual emissions equivalent to

555,959
cars per year
340,988
homes per year
116,245,996
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Plants

About this plant

The Tanjung Kidurong Combined Cycle Plant, located in Sarawak, Malaysia, is a significant facility in the country’s energy sector, boasting a generation capacity of 1,324 megawatts (MW). Owned by Sarawak Energy, this power plant plays a pivotal role in meeting the growing electricity demands of the region while supporting Malaysia’s commitment to energy sustainability and security. The plant primarily utilizes natural gas as its fuel source, which is known for being one of the cleaner fossil fuels available. This choice of fuel not only contributes to more efficient power generation but also aligns with Malaysia’s goals of reducing greenhouse gas emissions and transitioning towards a more environmentally friendly energy mix.

The technical aspects of the Tanjung Kidurong plant highlight its advanced operational capabilities. As a combined cycle power plant, it operates by utilizing both gas and steam turbines to generate electricity. Natural gas is first burned in a gas turbine, which drives the generator to produce electricity. The hot exhaust gases from this process are then directed to a heat recovery steam generator (HRSG), where they are used to produce steam that drives a steam turbine for additional electricity generation. This combined cycle process significantly increases the overall efficiency of the plant, allowing it to generate more electricity from the same amount of fuel compared to conventional power plants.

In terms of environmental impact, the Tanjung Kidurong Combined Cycle Plant represents a step forward in minimizing ecological footprints associated with power generation. By relying on natural gas, the plant emits less carbon dioxide and other pollutants compared to coal-fired power plants. However, it is important to note that while natural gas is cleaner than other fossil fuels, it is still a hydrocarbon and contributes to greenhouse gas emissions. Thus, ongoing efforts to monitor and reduce emissions are critical to ensuring that the plant operates within acceptable environmental standards.

Regionally, the Tanjung Kidurong plant is essential for the energy infrastructure of Sarawak and the broader Malaysian energy landscape. It supports the state’s economic growth by providing a reliable power supply to industries and residential areas alike. The plant also plays a crucial role in Sarawak’s ambitions to become a regional energy hub, leveraging its natural resources and strategic location to not only meet local needs but also to export electricity to neighboring regions. As Malaysia strives to enhance its energy diversity and resilience, the Tanjung Kidurong Combined Cycle Plant stands as a cornerstone of this effort, balancing economic growth with environmental stewardship.

More Natural Gas plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.