TE KOSOVO A — 617 MW Coal

Coal Verified

TE KOSOVO A is a 617 MW coal power plant located in Serbia. View location, capacity, and technical details.

Capacity
617 MW

Installed

Commissioned
1983

Year online

Owner
Electric Power Industry of Serbia

Operator

Location
42.68, 21.09

Coordinates

Insights

#6
largest in Serbia
#1,350
largest Coal worldwide
#3,938
largest worldwide
1983
14 yrs older than avg
4
operated by Electric Power Industry…
7
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
617 MW
Commissioned
1983
Status
Operational
Owner
Electric Power Industry of Serbia
Country
SRB
Coordinates
42.677, 21.089

Estimated Carbon Footprint

Annual CO₂
2,437,619 t

tonnes / year

Lifetime CO₂
97,504,757 t

over ~40 yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

529,917
cars / year
325,016
homes / year
110,800,860
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

TE Kosovo A is a coal-fired power plant located in Serbia with a generating capacity of 617 megawatts (MW). As one of the significant power plants in the region, it plays a crucial role in meeting the electricity demands of Serbia and contributes to the stability of the national grid. TE Kosovo A is part of a larger complex that includes other generation facilities, collectively known as the Kosovo Power Station, which has historically provided a substantial portion of the electricity consumed in Kosovo and parts of Serbia.

The power plant primarily utilizes coal as its fuel source, a common choice for energy generation due to its availability and cost-effectiveness. Coal-fired power plants like TE Kosovo A convert the chemical energy stored in coal into electrical energy through combustion. In this process, coal is burned to heat water, producing steam that drives turbines connected to electric generators. This method has been a staple of energy production for decades, although it comes with notable challenges and environmental considerations.

In terms of environmental impact, TE Kosovo A, like many coal-powered facilities, has been scrutinized for its emissions. The combustion of coal releases a variety of pollutants, including sulfur dioxide (SO2), nitrogen oxides (NOx), and particulate matter, which can contribute to air quality issues and health risks for nearby populations. Furthermore, coal combustion is a significant source of carbon dioxide (CO2), a greenhouse gas that contributes to climate change. As a result, the plant faces pressure to adopt cleaner technologies or transition to more sustainable energy sources in light of international climate agreements and local environmental policies.

Regionally, TE Kosovo A holds strategic importance as it not only supplies electricity to Serbia but also supports energy needs in Kosovo. The plant has been a cornerstone of energy security in the Balkans, particularly during periods of energy shortages or high demand. Its operation helps stabilize local energy markets, providing reliable electricity supply amid fluctuating regional energy dynamics. However, the reliance on coal also presents challenges, as the region seeks to transition towards greener energy sources in alignment with the European Union’s energy policies and climate goals.

In conclusion, TE Kosovo A remains a vital component of Serbia’s energy sector, balancing the demands of electricity production with the pressing need for environmental responsibility. As the country navigates the complexities of energy transition, the future of TE Kosovo A will likely involve discussions around modernization, efficiency enhancements, and the potential integration of renewable energy sources.

More Coal plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.